Cargando…
Multi-MW target station: Beam Window Issues and Transverse Film Target
The analysis of the EURISOL-DS Multi_MW target precise geometry has proved that large fission yields can be achieved with a 4 MW, providing a technically feasible design to evacuate the power deposited in the liquid mercury. Different designs for the mercury flow have been proposed, which maintain i...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
08/0
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1356469 |
_version_ | 1780922477090701312 |
---|---|
author | Herrera-Martinez, A Kadi, Y |
author_facet | Herrera-Martinez, A Kadi, Y |
author_sort | Herrera-Martinez, A |
collection | CERN |
description | The analysis of the EURISOL-DS Multi_MW target precise geometry has proved that large fission yields can be achieved with a 4 MW, providing a technically feasible design to evacuate the power deposited in the liquid mercury. Different designs for the mercury flow have been proposed, which maintain its temperature below the boiling point with moderate flow speeds (maximum 4 m/s). |
id | cern-1356469 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 08/0 |
record_format | invenio |
spelling | cern-13564692019-09-30T06:29:59Zhttp://cds.cern.ch/record/1356469engHerrera-Martinez, AKadi, YMulti-MW target station: Beam Window Issues and Transverse Film Target2: TASK 2The analysis of the EURISOL-DS Multi_MW target precise geometry has proved that large fission yields can be achieved with a 4 MW, providing a technically feasible design to evacuate the power deposited in the liquid mercury. Different designs for the mercury flow have been proposed, which maintain its temperature below the boiling point with moderate flow speeds (maximum 4 m/s).EURISOL-02-25-2007-0012oai:cds.cern.ch:135646908/02/07 |
spellingShingle | 2: TASK 2 Herrera-Martinez, A Kadi, Y Multi-MW target station: Beam Window Issues and Transverse Film Target |
title | Multi-MW target station: Beam Window Issues and Transverse Film Target |
title_full | Multi-MW target station: Beam Window Issues and Transverse Film Target |
title_fullStr | Multi-MW target station: Beam Window Issues and Transverse Film Target |
title_full_unstemmed | Multi-MW target station: Beam Window Issues and Transverse Film Target |
title_short | Multi-MW target station: Beam Window Issues and Transverse Film Target |
title_sort | multi-mw target station: beam window issues and transverse film target |
topic | 2: TASK 2 |
url | http://cds.cern.ch/record/1356469 |
work_keys_str_mv | AT herreramartineza multimwtargetstationbeamwindowissuesandtransversefilmtarget AT kadiy multimwtargetstationbeamwindowissuesandtransversefilmtarget |