EURISOL-DS Multi-MW Target: Cost Analysis for a Proposed Development Phase
The EURISOL Design Study has reached final completion and the three institutes, CERN, IPUL and PSI, participating in the development of the Multi-Megawatt target station have met the objective of a reliable, affordable and credible design. The costs involved in the full development of such a target...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
13/0
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1356473 |
Sumario: | The EURISOL Design Study has reached final completion and the three institutes, CERN, IPUL and PSI, participating in the development of the Multi-Megawatt target station have met the objective of a reliable, affordable and credible design. The costs involved in the full development of such a target are forecast to reach 200 million €, approximately 15% of the total costs of the EURISOL facility.A breakdown of the costs is presented as well as an outline of future possible R&D efforts aimed at improving reliability and safety of the facility. Another important goal of the proposed R&D is to minimise development risk by focusing resources, early on in the project, on areas identified as presenting a particular risk. An example clearly identified in the study would be the conditioning of the contaminated Mercury, both during the lifetime of the facility and after decommissioning. |
---|