EURISOL-DS Multi-MW Target: Cost Analysis for a Proposed Development Phase

The EURISOL Design Study has reached final completion and the three institutes, CERN, IPUL and PSI, participating in the development of the Multi-Megawatt target station have met the objective of a reliable, affordable and credible design. The costs involved in the full development of such a target...

Descripción completa

Detalles Bibliográficos
Autores principales: Karel, Samec, Lindroos, Mats, Kadi, Yacine, Noah, Etam, Lettry, Jacques, Wagner, Werner, Thomsen, Knud, Patorski, Jacek, Dementevjs, Sergej, Zik, Anatoli, Platacis, Erik
Lenguaje:eng
Publicado: 13/0
Materias:
Acceso en línea:http://cds.cern.ch/record/1356473
_version_ 1780922477957873664
author Karel, Samec
Lindroos, Mats
Kadi, Yacine
Noah, Etam
Lettry, Jacques
Wagner, Werner
Thomsen, Knud
Patorski, Jacek
Dementevjs, Sergej
Zik, Anatoli
Platacis, Erik
author_facet Karel, Samec
Lindroos, Mats
Kadi, Yacine
Noah, Etam
Lettry, Jacques
Wagner, Werner
Thomsen, Knud
Patorski, Jacek
Dementevjs, Sergej
Zik, Anatoli
Platacis, Erik
author_sort Karel, Samec
collection CERN
description The EURISOL Design Study has reached final completion and the three institutes, CERN, IPUL and PSI, participating in the development of the Multi-Megawatt target station have met the objective of a reliable, affordable and credible design. The costs involved in the full development of such a target are forecast to reach 200 million €, approximately 15% of the total costs of the EURISOL facility.A breakdown of the costs is presented as well as an outline of future possible R&D efforts aimed at improving reliability and safety of the facility. Another important goal of the proposed R&D is to minimise development risk by focusing resources, early on in the project, on areas identified as presenting a particular risk. An example clearly identified in the study would be the conditioning of the contaminated Mercury, both during the lifetime of the facility and after decommissioning.
id cern-1356473
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 13/0
record_format invenio
spelling cern-13564732019-09-30T06:29:59Zhttp://cds.cern.ch/record/1356473engKarel, SamecLindroos, MatsKadi, YacineNoah, EtamLettry, JacquesWagner, WernerThomsen, KnudPatorski, JacekDementevjs, SergejZik, AnatoliPlatacis, ErikEURISOL-DS Multi-MW Target: Cost Analysis for a Proposed Development Phase2: TASK 2The EURISOL Design Study has reached final completion and the three institutes, CERN, IPUL and PSI, participating in the development of the Multi-Megawatt target station have met the objective of a reliable, affordable and credible design. The costs involved in the full development of such a target are forecast to reach 200 million €, approximately 15% of the total costs of the EURISOL facility.A breakdown of the costs is presented as well as an outline of future possible R&D efforts aimed at improving reliability and safety of the facility. Another important goal of the proposed R&D is to minimise development risk by focusing resources, early on in the project, on areas identified as presenting a particular risk. An example clearly identified in the study would be the conditioning of the contaminated Mercury, both during the lifetime of the facility and after decommissioning.EURISOL-02-25-2009-0043oai:cds.cern.ch:135647313/08/09
spellingShingle 2: TASK 2
Karel, Samec
Lindroos, Mats
Kadi, Yacine
Noah, Etam
Lettry, Jacques
Wagner, Werner
Thomsen, Knud
Patorski, Jacek
Dementevjs, Sergej
Zik, Anatoli
Platacis, Erik
EURISOL-DS Multi-MW Target: Cost Analysis for a Proposed Development Phase
title EURISOL-DS Multi-MW Target: Cost Analysis for a Proposed Development Phase
title_full EURISOL-DS Multi-MW Target: Cost Analysis for a Proposed Development Phase
title_fullStr EURISOL-DS Multi-MW Target: Cost Analysis for a Proposed Development Phase
title_full_unstemmed EURISOL-DS Multi-MW Target: Cost Analysis for a Proposed Development Phase
title_short EURISOL-DS Multi-MW Target: Cost Analysis for a Proposed Development Phase
title_sort eurisol-ds multi-mw target: cost analysis for a proposed development phase
topic 2: TASK 2
url http://cds.cern.ch/record/1356473
work_keys_str_mv AT karelsamec eurisoldsmultimwtargetcostanalysisforaproposeddevelopmentphase
AT lindroosmats eurisoldsmultimwtargetcostanalysisforaproposeddevelopmentphase
AT kadiyacine eurisoldsmultimwtargetcostanalysisforaproposeddevelopmentphase
AT noahetam eurisoldsmultimwtargetcostanalysisforaproposeddevelopmentphase
AT lettryjacques eurisoldsmultimwtargetcostanalysisforaproposeddevelopmentphase
AT wagnerwerner eurisoldsmultimwtargetcostanalysisforaproposeddevelopmentphase
AT thomsenknud eurisoldsmultimwtargetcostanalysisforaproposeddevelopmentphase
AT patorskijacek eurisoldsmultimwtargetcostanalysisforaproposeddevelopmentphase
AT dementevjssergej eurisoldsmultimwtargetcostanalysisforaproposeddevelopmentphase
AT zikanatoli eurisoldsmultimwtargetcostanalysisforaproposeddevelopmentphase
AT plataciserik eurisoldsmultimwtargetcostanalysisforaproposeddevelopmentphase