Cargando…
The Multi MegaWatt target station of EURISOL facility and its performance (SATIF9)
This presentation summarises the work carried out for the Multi Megawatt target station of the EURISOL Design Study with a special attention to the coupled neutronics of the liquid converter and fission target (MAFF/PIAFE design like) and the overall performance of the facility, which will sustain f...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
27/1
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1356475 |
_version_ | 1780922478394081280 |
---|---|
author | Kharoua, C |
author_facet | Kharoua, C |
author_sort | Kharoua, C |
collection | CERN |
description | This presentation summarises the work carried out for the Multi Megawatt target station of the EURISOL Design Study with a special attention to the coupled neutronics of the liquid converter and fission target (MAFF/PIAFE design like) and the overall performance of the facility, which will sustain fast neutron fluxes of the order of 1014 n/cm2/s. The production of radionuclides in the actinide targets as well as in the liquid metal are also evaluated, showing that the targeted 1015 fissions/s can be achieved. |
id | cern-1356475 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 27/1 |
record_format | invenio |
spelling | cern-13564752019-09-30T06:29:59Zhttp://cds.cern.ch/record/1356475engKharoua, CThe Multi MegaWatt target station of EURISOL facility and its performance (SATIF9)2: TASK 2This presentation summarises the work carried out for the Multi Megawatt target station of the EURISOL Design Study with a special attention to the coupled neutronics of the liquid converter and fission target (MAFF/PIAFE design like) and the overall performance of the facility, which will sustain fast neutron fluxes of the order of 1014 n/cm2/s. The production of radionuclides in the actinide targets as well as in the liquid metal are also evaluated, showing that the targeted 1015 fissions/s can be achieved.EURISOL-02-22-2008-0055oai:cds.cern.ch:135647527/11/08 |
spellingShingle | 2: TASK 2 Kharoua, C The Multi MegaWatt target station of EURISOL facility and its performance (SATIF9) |
title | The Multi MegaWatt target station of EURISOL facility and its performance (SATIF9) |
title_full | The Multi MegaWatt target station of EURISOL facility and its performance (SATIF9) |
title_fullStr | The Multi MegaWatt target station of EURISOL facility and its performance (SATIF9) |
title_full_unstemmed | The Multi MegaWatt target station of EURISOL facility and its performance (SATIF9) |
title_short | The Multi MegaWatt target station of EURISOL facility and its performance (SATIF9) |
title_sort | multi megawatt target station of eurisol facility and its performance (satif9) |
topic | 2: TASK 2 |
url | http://cds.cern.ch/record/1356475 |
work_keys_str_mv | AT kharouac themultimegawatttargetstationofeurisolfacilityanditsperformancesatif9 AT kharouac multimegawatttargetstationofeurisolfacilityanditsperformancesatif9 |