Cargando…

LHCb: Study of a solution with COTS for the LHCb calorimeter upgrade

Since the end of the commissioning of LHCb in 2009 the detector has proven to work nicely even in high pile-up conditions and by the end of 2010 nominal instantaneous luminosity was reached. Data taking is expected to continue for 5 more years, aiming to accumulate an integrated luminosity of 5fb-1....

Descripción completa

Detalles Bibliográficos
Autor principal: Abellan Beteta, C
Lenguaje:eng
Publicado: 2011
Acceso en línea:http://cds.cern.ch/record/1360195
_version_ 1780922659129786368
author Abellan Beteta, C
author_facet Abellan Beteta, C
author_sort Abellan Beteta, C
collection CERN
description Since the end of the commissioning of LHCb in 2009 the detector has proven to work nicely even in high pile-up conditions and by the end of 2010 nominal instantaneous luminosity was reached. Data taking is expected to continue for 5 more years, aiming to accumulate an integrated luminosity of 5fb-1. Even if new physics is discovered at that time, it will be difficult to characterize it and it would be more profitable to upgrade the detector. The foreseen long shutdown offers an opportunity to upgrade the detector . As expressed in the Letter of Intend for the LHCb upgrade [1] the main objective of this enhancement is to have a 40MHz readout electronics to allow the use of a more flexible and efficient software-based triggering system. Moreover, after the shutdown, the instantaneous luminosity at the LHCb interaction point is expected to be multiplied by 5. From the point of view of the LHCb calorimeter changing the readout implies a change of the electronic boards. Also because of the luminosity increase and in order to preserve the photomultiplier's life expectancy, its gain will be reduced by a factor of 5. This has to be compensated in the front-end electronics, imposing new constraints in the performance of input analog electronics. New analog and digital electronics are being developed to solve these problems. In the analog part ASIC and Commercial Off The Shelf (COTS) solutions are under study. A suitable COTS design needs amplification before analog processing, forcing the clipping to be done in the front-end cards. A compact solution with differential amplifiers and delay lines will be shown as well as the status of prototypes and some results. [1] LHCb Collaboration, Letter of Intent for the LHCb Upgrade, CERN-LHCC-2011-001 ; LHCC-I-018; CERN (2011)
id cern-1360195
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2011
record_format invenio
spelling cern-13601952019-09-30T06:29:59Zhttp://cds.cern.ch/record/1360195engAbellan Beteta, CLHCb: Study of a solution with COTS for the LHCb calorimeter upgradeSince the end of the commissioning of LHCb in 2009 the detector has proven to work nicely even in high pile-up conditions and by the end of 2010 nominal instantaneous luminosity was reached. Data taking is expected to continue for 5 more years, aiming to accumulate an integrated luminosity of 5fb-1. Even if new physics is discovered at that time, it will be difficult to characterize it and it would be more profitable to upgrade the detector. The foreseen long shutdown offers an opportunity to upgrade the detector . As expressed in the Letter of Intend for the LHCb upgrade [1] the main objective of this enhancement is to have a 40MHz readout electronics to allow the use of a more flexible and efficient software-based triggering system. Moreover, after the shutdown, the instantaneous luminosity at the LHCb interaction point is expected to be multiplied by 5. From the point of view of the LHCb calorimeter changing the readout implies a change of the electronic boards. Also because of the luminosity increase and in order to preserve the photomultiplier's life expectancy, its gain will be reduced by a factor of 5. This has to be compensated in the front-end electronics, imposing new constraints in the performance of input analog electronics. New analog and digital electronics are being developed to solve these problems. In the analog part ASIC and Commercial Off The Shelf (COTS) solutions are under study. A suitable COTS design needs amplification before analog processing, forcing the clipping to be done in the front-end cards. A compact solution with differential amplifiers and delay lines will be shown as well as the status of prototypes and some results. [1] LHCb Collaboration, Letter of Intent for the LHCb Upgrade, CERN-LHCC-2011-001 ; LHCC-I-018; CERN (2011)Poster-2011-185oai:cds.cern.ch:13601952011-06-09
spellingShingle Abellan Beteta, C
LHCb: Study of a solution with COTS for the LHCb calorimeter upgrade
title LHCb: Study of a solution with COTS for the LHCb calorimeter upgrade
title_full LHCb: Study of a solution with COTS for the LHCb calorimeter upgrade
title_fullStr LHCb: Study of a solution with COTS for the LHCb calorimeter upgrade
title_full_unstemmed LHCb: Study of a solution with COTS for the LHCb calorimeter upgrade
title_short LHCb: Study of a solution with COTS for the LHCb calorimeter upgrade
title_sort lhcb: study of a solution with cots for the lhcb calorimeter upgrade
url http://cds.cern.ch/record/1360195
work_keys_str_mv AT abellanbetetac lhcbstudyofasolutionwithcotsforthelhcbcalorimeterupgrade