Cargando…

LHC Transvers Profile Monitors studies (MD on May 6th, 2011)

This note contains the preliminary results of the LHC MD that took place on 6-May-2011 (from 2 to 10 a.m.), dedicated to study Wire Scanners (WS), Synchrotron Radiation Monitors (BSRT) and Beam Gas Ionization Monitors (BGI). The MD aimed at performing different studies on the individual monitors as...

Descripción completa

Detalles Bibliográficos
Autores principales: Bravin, E, Boccardi, A, Dehning, B, Emery, J, Lefevre, T, Gras, JJ, Jeff, A, Rabiller, A, Roncarolo, F, Sapinski, M, Kain, V, Pojer, M, Bartosik, H, Salvant, B
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:http://cds.cern.ch/record/1362013
_version_ 1780922704066510848
author Bravin, E
Boccardi, A
Dehning, B
Emery, J
Lefevre, T
Gras, JJ
Jeff, A
Rabiller, A
Roncarolo, F
Sapinski, M
Kain, V
Pojer, M
Bartosik, H
Salvant, B
author_facet Bravin, E
Boccardi, A
Dehning, B
Emery, J
Lefevre, T
Gras, JJ
Jeff, A
Rabiller, A
Roncarolo, F
Sapinski, M
Kain, V
Pojer, M
Bartosik, H
Salvant, B
author_sort Bravin, E
collection CERN
description This note contains the preliminary results of the LHC MD that took place on 6-May-2011 (from 2 to 10 a.m.), dedicated to study Wire Scanners (WS), Synchrotron Radiation Monitors (BSRT) and Beam Gas Ionization Monitors (BGI). The MD aimed at performing different studies on the individual monitors as well as at cross calibrating them with beams composed of bunches with different transverse emittances in stable conditions. At the same time, it was possible to perform calibration studies with the Abort Gap Monitor (AGM) and Longitudinal Density Monitor (LDM) that share the extracted light with the BSRT.
id cern-1362013
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2011
record_format invenio
spelling cern-13620132019-09-30T06:29:59Zhttp://cds.cern.ch/record/1362013engBravin, EBoccardi, ADehning, BEmery, JLefevre, TGras, JJJeff, ARabiller, ARoncarolo, FSapinski, MKain, VPojer, MBartosik, HSalvant, BLHC Transvers Profile Monitors studies (MD on May 6th, 2011)Accelerators and Storage RingsThis note contains the preliminary results of the LHC MD that took place on 6-May-2011 (from 2 to 10 a.m.), dedicated to study Wire Scanners (WS), Synchrotron Radiation Monitors (BSRT) and Beam Gas Ionization Monitors (BGI). The MD aimed at performing different studies on the individual monitors as well as at cross calibrating them with beams composed of bunches with different transverse emittances in stable conditions. At the same time, it was possible to perform calibration studies with the Abort Gap Monitor (AGM) and Longitudinal Density Monitor (LDM) that share the extracted light with the BSRT.CERN-ATS-Note-2011-049 MDoai:cds.cern.ch:13620132011-06-01
spellingShingle Accelerators and Storage Rings
Bravin, E
Boccardi, A
Dehning, B
Emery, J
Lefevre, T
Gras, JJ
Jeff, A
Rabiller, A
Roncarolo, F
Sapinski, M
Kain, V
Pojer, M
Bartosik, H
Salvant, B
LHC Transvers Profile Monitors studies (MD on May 6th, 2011)
title LHC Transvers Profile Monitors studies (MD on May 6th, 2011)
title_full LHC Transvers Profile Monitors studies (MD on May 6th, 2011)
title_fullStr LHC Transvers Profile Monitors studies (MD on May 6th, 2011)
title_full_unstemmed LHC Transvers Profile Monitors studies (MD on May 6th, 2011)
title_short LHC Transvers Profile Monitors studies (MD on May 6th, 2011)
title_sort lhc transvers profile monitors studies (md on may 6th, 2011)
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1362013
work_keys_str_mv AT bravine lhctransversprofilemonitorsstudiesmdonmay6th2011
AT boccardia lhctransversprofilemonitorsstudiesmdonmay6th2011
AT dehningb lhctransversprofilemonitorsstudiesmdonmay6th2011
AT emeryj lhctransversprofilemonitorsstudiesmdonmay6th2011
AT lefevret lhctransversprofilemonitorsstudiesmdonmay6th2011
AT grasjj lhctransversprofilemonitorsstudiesmdonmay6th2011
AT jeffa lhctransversprofilemonitorsstudiesmdonmay6th2011
AT rabillera lhctransversprofilemonitorsstudiesmdonmay6th2011
AT roncarolof lhctransversprofilemonitorsstudiesmdonmay6th2011
AT sapinskim lhctransversprofilemonitorsstudiesmdonmay6th2011
AT kainv lhctransversprofilemonitorsstudiesmdonmay6th2011
AT pojerm lhctransversprofilemonitorsstudiesmdonmay6th2011
AT bartosikh lhctransversprofilemonitorsstudiesmdonmay6th2011
AT salvantb lhctransversprofilemonitorsstudiesmdonmay6th2011