First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4

The H- source and the low energy beam transport(LEBT) line will determine to a large extend the performance of Linac-4, the new machine foreseen at CERN as injector into the PS Booster. For this reason a test stand is being set up, consisting of the source, the LEBT, the RFQ and the chopper line. Up...

Descripción completa

Detalles Bibliográficos
Autores principales: Cheymol, B, Lallement, J B, Lokhovitsky, A, Midttun, O, Raich, U, Roncarolo, F, Scrivens, R, Zorin, E
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:http://cds.cern.ch/record/1372166
_version_ 1780922898522832896
author Cheymol, B
Lallement, J B
Lokhovitsky, A
Midttun, O
Raich, U
Roncarolo, F
Scrivens, R
Zorin, E
author_facet Cheymol, B
Lallement, J B
Lokhovitsky, A
Midttun, O
Raich, U
Roncarolo, F
Scrivens, R
Zorin, E
author_sort Cheymol, B
collection CERN
description The H- source and the low energy beam transport(LEBT) line will determine to a large extend the performance of Linac-4, the new machine foreseen at CERN as injector into the PS Booster. For this reason a test stand is being set up, consisting of the source, the LEBT, the RFQ and the chopper line. Up to now only the source and LEBT are installed. First measurements have been performed using a Faraday Cup to measure the total source intensity, a slit and grid emittance meter for transverse emittance measurements as well as a spectrometer for energy spread measurements. Beam intensity, profile, transverse emittance and energy spread have been measured. The paper discusses measurements done on H- beams at 35 kV extraction voltage as well as proton beams at 45 keV.
id cern-1372166
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2011
record_format invenio
spelling cern-13721662022-08-17T13:30:24Zhttp://cds.cern.ch/record/1372166engCheymol, BLallement, J BLokhovitsky, AMidttun, ORaich, URoncarolo, FScrivens, RZorin, EFirst Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4Accelerators and Storage RingsThe H- source and the low energy beam transport(LEBT) line will determine to a large extend the performance of Linac-4, the new machine foreseen at CERN as injector into the PS Booster. For this reason a test stand is being set up, consisting of the source, the LEBT, the RFQ and the chopper line. Up to now only the source and LEBT are installed. First measurements have been performed using a Faraday Cup to measure the total source intensity, a slit and grid emittance meter for transverse emittance measurements as well as a spectrometer for energy spread measurements. Beam intensity, profile, transverse emittance and energy spread have been measured. The paper discusses measurements done on H- beams at 35 kV extraction voltage as well as proton beams at 45 keV.CERN-BE-2011-005oai:cds.cern.ch:13721662011-05-01
spellingShingle Accelerators and Storage Rings
Cheymol, B
Lallement, J B
Lokhovitsky, A
Midttun, O
Raich, U
Roncarolo, F
Scrivens, R
Zorin, E
First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4
title First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4
title_full First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4
title_fullStr First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4
title_full_unstemmed First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4
title_short First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4
title_sort first results from beam measurements at the 3 mev test stand for cern linac4
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1372166
work_keys_str_mv AT cheymolb firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4
AT lallementjb firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4
AT lokhovitskya firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4
AT midttuno firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4
AT raichu firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4
AT roncarolof firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4
AT scrivensr firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4
AT zorine firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4