First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4
The H- source and the low energy beam transport(LEBT) line will determine to a large extend the performance of Linac-4, the new machine foreseen at CERN as injector into the PS Booster. For this reason a test stand is being set up, consisting of the source, the LEBT, the RFQ and the chopper line. Up...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1372166 |
_version_ | 1780922898522832896 |
---|---|
author | Cheymol, B Lallement, J B Lokhovitsky, A Midttun, O Raich, U Roncarolo, F Scrivens, R Zorin, E |
author_facet | Cheymol, B Lallement, J B Lokhovitsky, A Midttun, O Raich, U Roncarolo, F Scrivens, R Zorin, E |
author_sort | Cheymol, B |
collection | CERN |
description | The H- source and the low energy beam transport(LEBT) line will determine to a large extend the performance of Linac-4, the new machine foreseen at CERN as injector into the PS Booster. For this reason a test stand is being set up, consisting of the source, the LEBT, the RFQ and the chopper line. Up to now only the source and LEBT are installed. First measurements have been performed using a Faraday Cup to measure the total source intensity, a slit and grid emittance meter for transverse emittance measurements as well as a spectrometer for energy spread measurements. Beam intensity, profile, transverse emittance and energy spread have been measured. The paper discusses measurements done on H- beams at 35 kV extraction voltage as well as proton beams at 45 keV. |
id | cern-1372166 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-13721662022-08-17T13:30:24Zhttp://cds.cern.ch/record/1372166engCheymol, BLallement, J BLokhovitsky, AMidttun, ORaich, URoncarolo, FScrivens, RZorin, EFirst Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4Accelerators and Storage RingsThe H- source and the low energy beam transport(LEBT) line will determine to a large extend the performance of Linac-4, the new machine foreseen at CERN as injector into the PS Booster. For this reason a test stand is being set up, consisting of the source, the LEBT, the RFQ and the chopper line. Up to now only the source and LEBT are installed. First measurements have been performed using a Faraday Cup to measure the total source intensity, a slit and grid emittance meter for transverse emittance measurements as well as a spectrometer for energy spread measurements. Beam intensity, profile, transverse emittance and energy spread have been measured. The paper discusses measurements done on H- beams at 35 kV extraction voltage as well as proton beams at 45 keV.CERN-BE-2011-005oai:cds.cern.ch:13721662011-05-01 |
spellingShingle | Accelerators and Storage Rings Cheymol, B Lallement, J B Lokhovitsky, A Midttun, O Raich, U Roncarolo, F Scrivens, R Zorin, E First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4 |
title | First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4 |
title_full | First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4 |
title_fullStr | First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4 |
title_full_unstemmed | First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4 |
title_short | First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4 |
title_sort | first results from beam measurements at the 3 mev test stand for cern linac4 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1372166 |
work_keys_str_mv | AT cheymolb firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4 AT lallementjb firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4 AT lokhovitskya firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4 AT midttuno firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4 AT raichu firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4 AT roncarolof firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4 AT scrivensr firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4 AT zorine firstresultsfrombeammeasurementsatthe3mevteststandforcernlinac4 |