Cargando…
First Results from Beam Measurements at the 3 MeV Test Stand for CERN LINAC4
The H- source and the low energy beam transport(LEBT) line will determine to a large extend the performance of Linac-4, the new machine foreseen at CERN as injector into the PS Booster. For this reason a test stand is being set up, consisting of the source, the LEBT, the RFQ and the chopper line. Up...
Autores principales: | Cheymol, B, Lallement, J B, Lokhovitsky, A, Midttun, O, Raich, U, Roncarolo, F, Scrivens, R, Zorin, E |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1372166 |
Ejemplares similares
-
Commissioning of the LINAC4 Ion Source Transverse Emittance Meter
por: Bravin, E, et al.
Publicado: (2010) -
Design of the Emittance Meter for the 3 and 12 MeV LINAC4 H- Beam
por: Bravin, E, et al.
Publicado: (2010) -
First commissioning experience with the LINAC4 3 MeV front-end at CERN
por: Lallement, J B, et al.
Publicado: (2013) -
Beam Instrumentation Performance during Commissioning of CERN's Linac-4 to 50 MeV and 100 MeV
por: Raich, Uli, et al.
Publicado: (2016) -
3 MeV Test Stand commissioning report
por: Bellodi, Guilia, et al.
Publicado: (2013)