Cargando…

Operational Experience and Improvements of the LHC Beam Current Transformers

During the 2010 run the LHC continuously improved its performance. In particular the bunch charge and number of bunches were significantly increased, which revealed certain limitations of the LHC beam current transformers. The DC current transformers (DCCT), used to measure the circulating beam curr...

Descripción completa

Detalles Bibliográficos
Autores principales: Odier, P, Belohrad, D, Gras, J J, Ludwig, M
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:http://cds.cern.ch/record/1372191
_version_ 1780922902591307776
author Odier, P
Belohrad, D
Gras, J J
Ludwig, M
author_facet Odier, P
Belohrad, D
Gras, J J
Ludwig, M
author_sort Odier, P
collection CERN
description During the 2010 run the LHC continuously improved its performance. In particular the bunch charge and number of bunches were significantly increased, which revealed certain limitations of the LHC beam current transformers. The DC current transformers (DCCT), used to measure the circulating beam current, exhibited saturation related to bunch intensity, the number of batches in the machine and their spacing. Two major issues were also discovered on the fast beam current transformers (FBCT) used to measure the individual bunch charges: discrepancies in the measured intensities when compared to the DCCTs measurements and a bunch length dependence on the measured intensity. Further analysis showed that both problems are linked to the beam position dependence of the signal acquired from the toroids used in the FBCTs. This paper presents the observed issues, discusses possible solutions and reports on the results from modification made for the 2011 run.
id cern-1372191
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2011
record_format invenio
spelling cern-13721912022-08-17T13:30:25Zhttp://cds.cern.ch/record/1372191engOdier, PBelohrad, DGras, J JLudwig, MOperational Experience and Improvements of the LHC Beam Current TransformersAccelerators and Storage RingsDuring the 2010 run the LHC continuously improved its performance. In particular the bunch charge and number of bunches were significantly increased, which revealed certain limitations of the LHC beam current transformers. The DC current transformers (DCCT), used to measure the circulating beam current, exhibited saturation related to bunch intensity, the number of batches in the machine and their spacing. Two major issues were also discovered on the fast beam current transformers (FBCT) used to measure the individual bunch charges: discrepancies in the measured intensities when compared to the DCCTs measurements and a bunch length dependence on the measured intensity. Further analysis showed that both problems are linked to the beam position dependence of the signal acquired from the toroids used in the FBCTs. This paper presents the observed issues, discusses possible solutions and reports on the results from modification made for the 2011 run.CERN-BE-2011-015oai:cds.cern.ch:13721912011-05-01
spellingShingle Accelerators and Storage Rings
Odier, P
Belohrad, D
Gras, J J
Ludwig, M
Operational Experience and Improvements of the LHC Beam Current Transformers
title Operational Experience and Improvements of the LHC Beam Current Transformers
title_full Operational Experience and Improvements of the LHC Beam Current Transformers
title_fullStr Operational Experience and Improvements of the LHC Beam Current Transformers
title_full_unstemmed Operational Experience and Improvements of the LHC Beam Current Transformers
title_short Operational Experience and Improvements of the LHC Beam Current Transformers
title_sort operational experience and improvements of the lhc beam current transformers
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1372191
work_keys_str_mv AT odierp operationalexperienceandimprovementsofthelhcbeamcurrenttransformers
AT belohradd operationalexperienceandimprovementsofthelhcbeamcurrenttransformers
AT grasjj operationalexperienceandimprovementsofthelhcbeamcurrenttransformers
AT ludwigm operationalexperienceandimprovementsofthelhcbeamcurrenttransformers