Cargando…
Injection and dump considerations for a 16.5 TeV HE-LHC
Injection and beam dumping is considered for a 16.5 TeV hadron accelerator in the current LHC tunnel, with an injection energy in the range 1 - 1.3 TeV. The present systems are described and the possible upgrade scenarios investigated for higher beam rigidity. In addition to the required equipment p...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-003.128 http://cds.cern.ch/record/1374008 |
_version_ | 1780922925417758720 |
---|---|
author | Goddard, B. Barnes, M. Bartmann, W. Borburgh, J. Bracco, C. Ducimetiere, L. Kain, V. Meddahi, M. Mertens, V. Senaj, V. Uythoven, J. |
author_facet | Goddard, B. Barnes, M. Bartmann, W. Borburgh, J. Bracco, C. Ducimetiere, L. Kain, V. Meddahi, M. Mertens, V. Senaj, V. Uythoven, J. |
author_sort | Goddard, B. |
collection | CERN |
description | Injection and beam dumping is considered for a 16.5 TeV hadron accelerator in the current LHC tunnel, with an injection energy in the range 1 - 1.3 TeV. The present systems are described and the possible upgrade scenarios investigated for higher beam rigidity. In addition to the required equipment performance, the machine protection related aspects are explored. The expected constraints on the machine layout are also given. The technological challenges for the different equipment subsystems are detailed, and areas where R&D is necessary are highlighted. |
id | cern-1374008 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
publisher | CERN |
record_format | invenio |
spelling | cern-13740082023-03-14T16:56:19Zdoi:10.5170/CERN-2011-003.128http://cds.cern.ch/record/1374008engGoddard, B.Barnes, M.Bartmann, W.Borburgh, J.Bracco, C.Ducimetiere, L.Kain, V.Meddahi, M.Mertens, V.Senaj, V.Uythoven, J.Injection and dump considerations for a 16.5 TeV HE-LHCAccelerators and Storage RingsInjection and beam dumping is considered for a 16.5 TeV hadron accelerator in the current LHC tunnel, with an injection energy in the range 1 - 1.3 TeV. The present systems are described and the possible upgrade scenarios investigated for higher beam rigidity. In addition to the required equipment performance, the machine protection related aspects are explored. The expected constraints on the machine layout are also given. The technological challenges for the different equipment subsystems are detailed, and areas where R&D is necessary are highlighted.Injection and beam dumping is considered for a 16.5 TeV hadron accelerator in the current LHC tunnel, with an injection energy in the range 1 - 1.3 TeV. The present systems are described and the possible upgrade scenarios investigated for higher beam rigidity. In addition to the required equipment performance, the machine protection related aspects are explored. The expected constraints on the machine layout are also given. The technological challenges for the different equipment subsystems are detailed, and areas where R&D is necessary are highlighted.CERNarXiv:1108.1664oai:cds.cern.ch:13740082011-08-09 |
spellingShingle | Accelerators and Storage Rings Goddard, B. Barnes, M. Bartmann, W. Borburgh, J. Bracco, C. Ducimetiere, L. Kain, V. Meddahi, M. Mertens, V. Senaj, V. Uythoven, J. Injection and dump considerations for a 16.5 TeV HE-LHC |
title | Injection and dump considerations for a 16.5 TeV HE-LHC |
title_full | Injection and dump considerations for a 16.5 TeV HE-LHC |
title_fullStr | Injection and dump considerations for a 16.5 TeV HE-LHC |
title_full_unstemmed | Injection and dump considerations for a 16.5 TeV HE-LHC |
title_short | Injection and dump considerations for a 16.5 TeV HE-LHC |
title_sort | injection and dump considerations for a 16.5 tev he-lhc |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.5170/CERN-2011-003.128 http://cds.cern.ch/record/1374008 |
work_keys_str_mv | AT goddardb injectionanddumpconsiderationsfora165tevhelhc AT barnesm injectionanddumpconsiderationsfora165tevhelhc AT bartmannw injectionanddumpconsiderationsfora165tevhelhc AT borburghj injectionanddumpconsiderationsfora165tevhelhc AT braccoc injectionanddumpconsiderationsfora165tevhelhc AT ducimetierel injectionanddumpconsiderationsfora165tevhelhc AT kainv injectionanddumpconsiderationsfora165tevhelhc AT meddahim injectionanddumpconsiderationsfora165tevhelhc AT mertensv injectionanddumpconsiderationsfora165tevhelhc AT senajv injectionanddumpconsiderationsfora165tevhelhc AT uythovenj injectionanddumpconsiderationsfora165tevhelhc |