Cargando…
Injection and dump considerations for a 16.5 TeV HE-LHC
Injection and beam dumping is considered for a 16.5 TeV hadron accelerator in the current LHC tunnel, with an injection energy in the range 1 - 1.3 TeV. The present systems are described and the possible upgrade scenarios investigated for higher beam rigidity. In addition to the required equipment p...
Autores principales: | Goddard, B., Barnes, M., Bartmann, W., Borburgh, J., Bracco, C., Ducimetiere, L., Kain, V., Meddahi, M., Mertens, V., Senaj, V., Uythoven, J. |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-003.128 http://cds.cern.ch/record/1374008 |
Ejemplares similares
-
Aperture Measurements of the LHC Injection Regions and Beam Dump Systems
por: Goddard, B, et al.
Publicado: (2010) -
Injection and Dump Systems
por: Bracco, C, et al.
Publicado: (2012) -
Injection and Dump Systems for a 13.5 TeV Hadron Synchrotron HE-LHC
por: Bartmann, Wolfgang, et al.
Publicado: (2018) -
Considerations on an Upgrade Possibility of the LHC Beam Dump Kicker System
por: Fraser, Matthew, et al.
Publicado: (2016) -
Considerations for the Beam Dump System of a 100 TeV Centre-of-mass FCC hh Collider
por: Kramer, Thomas, et al.
Publicado: (2015)