Cargando…
Embedded Collimator Beam Position Monitors
The LHC collimation system is crucial for safe and reliable operation of proton beams with 350 MJ stored energy. Currently the collimator set-up is performed by observing beam losses when approaching the collimator jaws to the beam. For all 100 LHC movable collimators t...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1375168 |
_version_ | 1780922950391693312 |
---|---|
author | Bertarelli, A Boccard, C Dallocchio, A Gasior, M Gentini, L Nosych, A |
author_facet | Bertarelli, A Boccard, C Dallocchio, A Gasior, M Gentini, L Nosych, A |
author_sort | Bertarelli, A |
collection | CERN |
description | The LHC collimation system is crucial for safe and reliable operation of proton beams with 350 MJ stored energy. Currently the collimator set-up is performed by observing beam losses when approaching the collimator jaws to the beam. For all 100 LHC movable collimators the procedure may take several hours and since it has to be repeated whenever the beam configuration changes significantly, the collimator setup has an important impact on the overall machine operation efficiency. To reduce the collimator setup time by two orders of magnitude the next generation of the LHC collimators will be equipped with button beam position monitors (BPMs) embedded into the collimator jaws. This paper describes the BPM design and presents prototype results obtained with beam in the CERN-SPS. |
id | cern-1375168 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-13751682022-08-17T13:26:11Zhttp://cds.cern.ch/record/1375168engBertarelli, ABoccard, CDallocchio, AGasior, MGentini, LNosych, AEmbedded Collimator Beam Position MonitorsAccelerators and Storage RingsThe LHC collimation system is crucial for safe and reliable operation of proton beams with 350 MJ stored energy. Currently the collimator set-up is performed by observing beam losses when approaching the collimator jaws to the beam. For all 100 LHC movable collimators the procedure may take several hours and since it has to be repeated whenever the beam configuration changes significantly, the collimator setup has an important impact on the overall machine operation efficiency. To reduce the collimator setup time by two orders of magnitude the next generation of the LHC collimators will be equipped with button beam position monitors (BPMs) embedded into the collimator jaws. This paper describes the BPM design and presents prototype results obtained with beam in the CERN-SPS.CERN-BE-2011-023oai:cds.cern.ch:13751682011-05-01 |
spellingShingle | Accelerators and Storage Rings Bertarelli, A Boccard, C Dallocchio, A Gasior, M Gentini, L Nosych, A Embedded Collimator Beam Position Monitors |
title | Embedded Collimator Beam Position Monitors |
title_full | Embedded Collimator Beam Position Monitors |
title_fullStr | Embedded Collimator Beam Position Monitors |
title_full_unstemmed | Embedded Collimator Beam Position Monitors |
title_short | Embedded Collimator Beam Position Monitors |
title_sort | embedded collimator beam position monitors |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1375168 |
work_keys_str_mv | AT bertarellia embeddedcollimatorbeampositionmonitors AT boccardc embeddedcollimatorbeampositionmonitors AT dallocchioa embeddedcollimatorbeampositionmonitors AT gasiorm embeddedcollimatorbeampositionmonitors AT gentinil embeddedcollimatorbeampositionmonitors AT nosycha embeddedcollimatorbeampositionmonitors |