Cargando…
BI MD Studies on June 29th 2011
This note contains the preliminary results of the LHC MD that took place on 29-June-2011 (from 10 p.m. to 07 a.m.), dedicated to study Beam Current Monitors (BCT), Wire Scaners (WS), Synchrotron Radiation (BSRT), Beam Position (BPM), Wall Current (WCM) and Beam Gas Ionization (BGI) monitors. The MD...
Autores principales: | , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1376131 |
Sumario: | This note contains the preliminary results of the LHC MD that took place on 29-June-2011 (from 10 p.m. to 07 a.m.), dedicated to study Beam Current Monitors (BCT), Wire Scaners (WS), Synchrotron Radiation (BSRT), Beam Position (BPM), Wall Current (WCM) and Beam Gas Ionization (BGI) monitors. The MD aimed at performing different studies on the individual monitors. At the same time, it was possible to perform calibration studies with the Abort Gap (AGM) and Longitudinal Density (LDM) monitors that share the extracted light with the BSRT. Additionally some observations about the beam stability and emittance dependence on the chromaticity were performed. |
---|