Cargando…
BI MD Studies on June 29th 2011
This note contains the preliminary results of the LHC MD that took place on 29-June-2011 (from 10 p.m. to 07 a.m.), dedicated to study Beam Current Monitors (BCT), Wire Scaners (WS), Synchrotron Radiation (BSRT), Beam Position (BPM), Wall Current (WCM) and Beam Gas Ionization (BGI) monitors. The MD...
Autores principales: | Belohrad, D, Boccardi, A, Bravin, E, Calvo, E, Dehning, B, Emery, J, Favier, M, Gras, JJ, Guerrero, A, Jeff, A, Lefevre, T, Rabiller, A, Roncarolo, F, Sapinski, M, Soby, L, Steinhagen, R |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1376131 |
Ejemplares similares
-
BI MD studies on August 25th 2011
por: Belohrad, D, et al.
Publicado: (2011) -
BI MD studies on April 22nd 2012 (LHC MD-1)
por: Baer, T, et al.
Publicado: (2012) -
LHC Transvers Profile Monitors studies (MD on May 6th, 2011)
por: Bravin, E, et al.
Publicado: (2011) -
Can we get a reliable on-line measurements of the transverse beam size?
por: Roncarolo, F, et al.
Publicado: (2010) -
Bunch by bunch beam instrumentation
por: Lefevre, T, et al.
Publicado: (2010)