Cargando…
Upgrade studies for the LHC collimators
The Phase-I LHC Collimation System has to be upgraded to work at high intensity and energy. Theoretical and engineering studies are focusing on different regions of the machine. The IR3 combined momentum and betatron cleaning, initially approved for installation, has presently been kept as fallback...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1381551 |
_version_ | 1780923095726424064 |
---|---|
author | Rossi, A Wollmann, D Assmann, R |
author_facet | Rossi, A Wollmann, D Assmann, R |
author_sort | Rossi, A |
collection | CERN |
description | The Phase-I LHC Collimation System has to be upgraded to work at high intensity and energy. Theoretical and engineering studies are focusing on different regions of the machine. The IR3 combined momentum and betatron cleaning, initially approved for installation, has presently been kept as fallback solution in case radiation to equipment limits LHC performance. The installation of collimators in the dispersion suppressor section DS3 has been delayed. In this paper we present predictions with matched optics and the effect of machine imperfections on the collimation performance with IR3 combined cleaning, with and without DS3 collimators. |
id | cern-1381551 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-13815512022-08-17T13:31:10Zhttp://cds.cern.ch/record/1381551engRossi, AWollmann, DAssmann, RUpgrade studies for the LHC collimatorsAccelerators and Storage RingsThe Phase-I LHC Collimation System has to be upgraded to work at high intensity and energy. Theoretical and engineering studies are focusing on different regions of the machine. The IR3 combined momentum and betatron cleaning, initially approved for installation, has presently been kept as fallback solution in case radiation to equipment limits LHC performance. The installation of collimators in the dispersion suppressor section DS3 has been delayed. In this paper we present predictions with matched optics and the effect of machine imperfections on the collimation performance with IR3 combined cleaning, with and without DS3 collimators.CERN-ATS-2011-113oai:cds.cern.ch:13815512011-09-13 |
spellingShingle | Accelerators and Storage Rings Rossi, A Wollmann, D Assmann, R Upgrade studies for the LHC collimators |
title | Upgrade studies for the LHC collimators |
title_full | Upgrade studies for the LHC collimators |
title_fullStr | Upgrade studies for the LHC collimators |
title_full_unstemmed | Upgrade studies for the LHC collimators |
title_short | Upgrade studies for the LHC collimators |
title_sort | upgrade studies for the lhc collimators |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1381551 |
work_keys_str_mv | AT rossia upgradestudiesforthelhccollimators AT wollmannd upgradestudiesforthelhccollimators AT assmannr upgradestudiesforthelhccollimators |