Upgrade studies for the LHC collimators

The Phase-I LHC Collimation System has to be upgraded to work at high intensity and energy. Theoretical and engineering studies are focusing on different regions of the machine. The IR3 combined momentum and betatron cleaning, initially approved for installation, has presently been kept as fallback...

Descripción completa

Detalles Bibliográficos
Autores principales: Rossi, A, Wollmann, D, Assmann, R
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:http://cds.cern.ch/record/1381551
_version_ 1780923095726424064
author Rossi, A
Wollmann, D
Assmann, R
author_facet Rossi, A
Wollmann, D
Assmann, R
author_sort Rossi, A
collection CERN
description The Phase-I LHC Collimation System has to be upgraded to work at high intensity and energy. Theoretical and engineering studies are focusing on different regions of the machine. The IR3 combined momentum and betatron cleaning, initially approved for installation, has presently been kept as fallback solution in case radiation to equipment limits LHC performance. The installation of collimators in the dispersion suppressor section DS3 has been delayed. In this paper we present predictions with matched optics and the effect of machine imperfections on the collimation performance with IR3 combined cleaning, with and without DS3 collimators.
id cern-1381551
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2011
record_format invenio
spelling cern-13815512022-08-17T13:31:10Zhttp://cds.cern.ch/record/1381551engRossi, AWollmann, DAssmann, RUpgrade studies for the LHC collimatorsAccelerators and Storage RingsThe Phase-I LHC Collimation System has to be upgraded to work at high intensity and energy. Theoretical and engineering studies are focusing on different regions of the machine. The IR3 combined momentum and betatron cleaning, initially approved for installation, has presently been kept as fallback solution in case radiation to equipment limits LHC performance. The installation of collimators in the dispersion suppressor section DS3 has been delayed. In this paper we present predictions with matched optics and the effect of machine imperfections on the collimation performance with IR3 combined cleaning, with and without DS3 collimators.CERN-ATS-2011-113oai:cds.cern.ch:13815512011-09-13
spellingShingle Accelerators and Storage Rings
Rossi, A
Wollmann, D
Assmann, R
Upgrade studies for the LHC collimators
title Upgrade studies for the LHC collimators
title_full Upgrade studies for the LHC collimators
title_fullStr Upgrade studies for the LHC collimators
title_full_unstemmed Upgrade studies for the LHC collimators
title_short Upgrade studies for the LHC collimators
title_sort upgrade studies for the lhc collimators
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1381551
work_keys_str_mv AT rossia upgradestudiesforthelhccollimators
AT wollmannd upgradestudiesforthelhccollimators
AT assmannr upgradestudiesforthelhccollimators