Cargando…
Evaluation of the combined betatron and momentum cleaning in point 3 in terms of cleaning efficiency and energy deposition for the LHC Collimation upgrade
The Phase I LHC Collimation System Upgrade could include moving part of the Betatron Cleaning from LHC Point 7 to Point 3 to improve both operation flexibility and intensity reach. In addition, the partial relocation of beam losses from the current Betatron cleaning region at Point 7 will mitigate t...
Autores principales: | Lari, L, Assmann, R W, Boccone, V, Brugger, M, Cerutti, F, Ferrari, A, Rossi, A, Versaci, R, Vlachoudis, V, Wollmann, D, Mereghetti, A, Faus-Golfe, A |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1381558 |
Ejemplares similares
-
Studies for an alternative LHC non-linear collimation system
por: Lari, L, et al.
Publicado: (2012) -
STUDIES ON COMBINED MOMENTUM AND BETATRON CLEANING IN THE LHC
por: Assmann, R, et al.
Publicado: (2009) -
Studies on combined momentum and betatron cleaning in the LHC
por: Assmann, R, et al.
Publicado: (2009) -
Accelerator physics studies on the effects from an asynchronous beam dump onto the LHC experimental region collimators
por: Lari, L, et al.
Publicado: (2012) -
Estimate of Warm Magnets Lifetime in the Betatron and Momentum Cleaning Insertions of the LHC
por: Salvachua, B, et al.
Publicado: (2013)