Cargando…
90 m OPTICS COMMISSIONNING
Special β = 90 m optics have been developed for the two very high luminosity insertions of the LHC [1] [2], as a first step to allow for very low angle precision measurements of the proton-proton collisions in the LHC. These optics were developed to be compatible with the standard LHC injection and...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1382027 |
_version_ | 1780923106522562560 |
---|---|
author | Cavalier, S Burkhardt, H Deile, M Fitterer, M Redaelli, S Tomas, R Muller, G |
author_facet | Cavalier, S Burkhardt, H Deile, M Fitterer, M Redaelli, S Tomas, R Muller, G |
author_sort | Cavalier, S |
collection | CERN |
description | Special β = 90 m optics have been developed for the two very high luminosity insertions of the LHC [1] [2], as a first step to allow for very low angle precision measurements of the proton-proton collisions in the LHC. These optics were developed to be compatible with the standard LHC injection and ramp optics. The target value of β = 90 m is reached by an un-squeeze from the injection β = 11 m. We report about the implementation of this optics and the first experience gained in commissioning with beam. |
id | cern-1382027 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-13820272022-08-17T13:31:38Zhttp://cds.cern.ch/record/1382027engCavalier, SBurkhardt, HDeile, MFitterer, MRedaelli, STomas, RMuller, G90 m OPTICS COMMISSIONNINGAccelerators and Storage RingsSpecial β = 90 m optics have been developed for the two very high luminosity insertions of the LHC [1] [2], as a first step to allow for very low angle precision measurements of the proton-proton collisions in the LHC. These optics were developed to be compatible with the standard LHC injection and ramp optics. The target value of β = 90 m is reached by an un-squeeze from the injection β = 11 m. We report about the implementation of this optics and the first experience gained in commissioning with beam.CERN-ATS-2011-133oai:cds.cern.ch:13820272011-09-14 |
spellingShingle | Accelerators and Storage Rings Cavalier, S Burkhardt, H Deile, M Fitterer, M Redaelli, S Tomas, R Muller, G 90 m OPTICS COMMISSIONNING |
title | 90 m OPTICS COMMISSIONNING |
title_full | 90 m OPTICS COMMISSIONNING |
title_fullStr | 90 m OPTICS COMMISSIONNING |
title_full_unstemmed | 90 m OPTICS COMMISSIONNING |
title_short | 90 m OPTICS COMMISSIONNING |
title_sort | 90 m optics commissionning |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1382027 |
work_keys_str_mv | AT cavaliers 90mopticscommissionning AT burkhardth 90mopticscommissionning AT deilem 90mopticscommissionning AT fittererm 90mopticscommissionning AT redaellis 90mopticscommissionning AT tomasr 90mopticscommissionning AT mullerg 90mopticscommissionning |