Cargando…

Status of the EP Simulations and Facilities for the SPL

CERN is assembling a new vertical electropolishing facility in order to process several niobium cavities of beta 1 and beta 0.65 in the context of the HP-SPL R&D programme. Electrochemical simulations are being used in order to define the optimal cathode geometry to process the cavities...

Descripción completa

Detalles Bibliográficos
Autores principales: Calatroni, S, Ferreira, L, Macatrao, M, Skala, A, Sosin, M, de Waele, R, Withofs, Y
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:http://cds.cern.ch/record/1386713
_version_ 1780923232472268800
author Calatroni, S
Ferreira, L
Macatrao, M
Skala, A
Sosin, M
de Waele, R
Withofs, Y
author_facet Calatroni, S
Ferreira, L
Macatrao, M
Skala, A
Sosin, M
de Waele, R
Withofs, Y
author_sort Calatroni, S
collection CERN
description CERN is assembling a new vertical electropolishing facility in order to process several niobium cavities of beta 1 and beta 0.65 in the context of the HP-SPL R&D programme. Electrochemical simulations are being used in order to define the optimal cathode geometry to process the cavities in a vertical position. Macroscopic properties of fluid dynamics like the Reynolds number and thermodynamics linked to the power dissipated in the process are taken into account to dimension the main system components. All the materials from the different equipments must be compatible with all chemicals within the required working temperature and pressure. To provide safe operating conditions when handling chemicals or processing cavities, specific safety and protection equipment is also foreseen.
id cern-1386713
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2011
record_format invenio
spelling cern-13867132019-09-30T06:29:59Zhttp://cds.cern.ch/record/1386713engCalatroni, SFerreira, LMacatrao, MSkala, ASosin, Mde Waele, RWithofs, YStatus of the EP Simulations and Facilities for the SPLAccelerators and Storage RingsCERN is assembling a new vertical electropolishing facility in order to process several niobium cavities of beta 1 and beta 0.65 in the context of the HP-SPL R&D programme. Electrochemical simulations are being used in order to define the optimal cathode geometry to process the cavities in a vertical position. Macroscopic properties of fluid dynamics like the Reynolds number and thermodynamics linked to the power dissipated in the process are taken into account to dimension the main system components. All the materials from the different equipments must be compatible with all chemicals within the required working temperature and pressure. To provide safe operating conditions when handling chemicals or processing cavities, specific safety and protection equipment is also foreseen.CERN-ATS-2011-191oai:cds.cern.ch:13867132011-10-01
spellingShingle Accelerators and Storage Rings
Calatroni, S
Ferreira, L
Macatrao, M
Skala, A
Sosin, M
de Waele, R
Withofs, Y
Status of the EP Simulations and Facilities for the SPL
title Status of the EP Simulations and Facilities for the SPL
title_full Status of the EP Simulations and Facilities for the SPL
title_fullStr Status of the EP Simulations and Facilities for the SPL
title_full_unstemmed Status of the EP Simulations and Facilities for the SPL
title_short Status of the EP Simulations and Facilities for the SPL
title_sort status of the ep simulations and facilities for the spl
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1386713
work_keys_str_mv AT calatronis statusoftheepsimulationsandfacilitiesforthespl
AT ferreiral statusoftheepsimulationsandfacilitiesforthespl
AT macatraom statusoftheepsimulationsandfacilitiesforthespl
AT skalaa statusoftheepsimulationsandfacilitiesforthespl
AT sosinm statusoftheepsimulationsandfacilitiesforthespl
AT dewaeler statusoftheepsimulationsandfacilitiesforthespl
AT withofsy statusoftheepsimulationsandfacilitiesforthespl