Cargando…
Tools for Validation and Analysis of a Large Amount of Experimental Data from Magnetic Measurement System: a Case Study at CERN
A flexible and easy-to-implement management structure for large amount of measurement and test data is proposed. Its main aim is to cope with industrial and research environment where the difficulty to make measurements requires to minimise the number of measurements campaigns and maximize the use o...
Autores principales: | Afonso, V, Fiscarelli1, L, García Pérez, J, Montenero, G, Walckiers, L |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1392620 |
Ejemplares similares
-
Active Compensation of field errors within +-2 ppm in Superconducting Magnets
por: Arpaia, P, et al.
Publicado: (2011) -
Compensation of Third-Harmonic Field Error in the Main Dipole Magnets
por: Arpaia, P, et al.
Publicado: (2010) -
Measurement and Scaling Laws of the Sextupole Component in the LHC Dipole Magnets
por: Walckiers, L, et al.
Publicado: (2010) -
Compensation of third-harmonic field error in LHC main dipole magnets
por: Arpaia, Pasquale, et al.
Publicado: (2010) -
Measurement-Domain Specific Language for Magnetic Test Specifications at CERN
por: Arpaia, L, et al.
Publicado: (2009)