Cargando…
The LHCb Eventbuilder: Design, Implementation and Operational Experience
The LHCb event-builder is implemented using a large Gigabit Ethernet network using a push-protocol for a single stage read-out at a 1 MHz event injection rate. The destination assignment and dynamic load-balancing are facilitated by LHCb's Timing and Fast Control system. The assembly of event f...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TNS.2011.2151876 http://cds.cern.ch/record/1399724 |
_version_ | 1780923614080532480 |
---|---|
author | Neufeld, N Frank, M Garnier, J C Liu, G M Jost, B Gaspar, C Jacobsson, R |
author_facet | Neufeld, N Frank, M Garnier, J C Liu, G M Jost, B Gaspar, C Jacobsson, R |
author_sort | Neufeld, N |
collection | CERN |
description | The LHCb event-builder is implemented using a large Gigabit Ethernet network using a push-protocol for a single stage read-out at a 1 MHz event injection rate. The destination assignment and dynamic load-balancing are facilitated by LHCb's Timing and Fast Control system. The assembly of event fragments is done on each event-filter farm node instead of having dedicated builder units. The design of the event-builder will be shortly described, followed by a description of the implementation, the protocol used and the performance during first data taking. The emphasis will be on the experience we gained during the running of such a large event-building network. We will discuss the problems we encountered and how we overcame them. |
id | cern-1399724 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-13997242019-09-30T06:29:59Zdoi:10.1109/TNS.2011.2151876http://cds.cern.ch/record/1399724engNeufeld, NFrank, MGarnier, J CLiu, G MJost, BGaspar, CJacobsson, RThe LHCb Eventbuilder: Design, Implementation and Operational ExperienceXXNuclear Physics - XXThe LHCb event-builder is implemented using a large Gigabit Ethernet network using a push-protocol for a single stage read-out at a 1 MHz event injection rate. The destination assignment and dynamic load-balancing are facilitated by LHCb's Timing and Fast Control system. The assembly of event fragments is done on each event-filter farm node instead of having dedicated builder units. The design of the event-builder will be shortly described, followed by a description of the implementation, the protocol used and the performance during first data taking. The emphasis will be on the experience we gained during the running of such a large event-building network. We will discuss the problems we encountered and how we overcame them.oai:cds.cern.ch:13997242011 |
spellingShingle | XX Nuclear Physics - XX Neufeld, N Frank, M Garnier, J C Liu, G M Jost, B Gaspar, C Jacobsson, R The LHCb Eventbuilder: Design, Implementation and Operational Experience |
title | The LHCb Eventbuilder: Design, Implementation and Operational Experience |
title_full | The LHCb Eventbuilder: Design, Implementation and Operational Experience |
title_fullStr | The LHCb Eventbuilder: Design, Implementation and Operational Experience |
title_full_unstemmed | The LHCb Eventbuilder: Design, Implementation and Operational Experience |
title_short | The LHCb Eventbuilder: Design, Implementation and Operational Experience |
title_sort | lhcb eventbuilder: design, implementation and operational experience |
topic | XX Nuclear Physics - XX |
url | https://dx.doi.org/10.1109/TNS.2011.2151876 http://cds.cern.ch/record/1399724 |
work_keys_str_mv | AT neufeldn thelhcbeventbuilderdesignimplementationandoperationalexperience AT frankm thelhcbeventbuilderdesignimplementationandoperationalexperience AT garnierjc thelhcbeventbuilderdesignimplementationandoperationalexperience AT liugm thelhcbeventbuilderdesignimplementationandoperationalexperience AT jostb thelhcbeventbuilderdesignimplementationandoperationalexperience AT gasparc thelhcbeventbuilderdesignimplementationandoperationalexperience AT jacobssonr thelhcbeventbuilderdesignimplementationandoperationalexperience AT neufeldn lhcbeventbuilderdesignimplementationandoperationalexperience AT frankm lhcbeventbuilderdesignimplementationandoperationalexperience AT garnierjc lhcbeventbuilderdesignimplementationandoperationalexperience AT liugm lhcbeventbuilderdesignimplementationandoperationalexperience AT jostb lhcbeventbuilderdesignimplementationandoperationalexperience AT gasparc lhcbeventbuilderdesignimplementationandoperationalexperience AT jacobssonr lhcbeventbuilderdesignimplementationandoperationalexperience |