Consolidation of the 13 kA Interconnects in the LHC for Operation at 7 TeV
The accident in the LHC in September 2008 occurred in an interconnection between two magnets of the 13 kA dipole circuit. Successive measurements of the resistance of other interconnects revealed other defective joints, even though the SC cables were properly connected. These defective joints are ch...
Autores principales: | , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2010.2083622 http://cds.cern.ch/record/1399774 |
_version_ | 1780923622036078592 |
---|---|
author | Verweij, A P Lasheras, N C Tock, J P Willering, G P Steckert, J Perin, A Scheuerlein, C Mathot, S Koratzinos, M Garion, C Denz, R Fessia, P Charifoulline, Z Bertinelli, F Sgobba, S ten Kate, H H J |
author_facet | Verweij, A P Lasheras, N C Tock, J P Willering, G P Steckert, J Perin, A Scheuerlein, C Mathot, S Koratzinos, M Garion, C Denz, R Fessia, P Charifoulline, Z Bertinelli, F Sgobba, S ten Kate, H H J |
author_sort | Verweij, A P |
collection | CERN |
description | The accident in the LHC in September 2008 occurred in an interconnection between two magnets of the 13 kA dipole circuit. Successive measurements of the resistance of other interconnects revealed other defective joints, even though the SC cables were properly connected. These defective joints are characterized by a poor bonding between the SC cable and the copper stabilizer in combination with an electrical discontinuity in the copper stabilizer. A quench at the 7-13 kA level in such a joint can lead to a fast and unprotected thermal run-away and hence opening of the circuit. It has therefore been decided to operate the LHC at a reduced and safe current of 6 kA corresponding to 3.5 TeV beam energy until all defective joints are repaired. A task force is reviewing the status of all electrical joints in the magnet circuits and preparing for the necessary repairs. The principle solution is to resolder the worst defective joints and, in addition, to apply an electrical shunt made of copper across all joints with sufficient cross-section to guarantee safe 12-13 kA operation at 7-7.5 TeV. In this paper the various actions that have lead to this solution are presented. |
id | cern-1399774 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-13997742019-09-30T06:29:59Zdoi:10.1109/TASC.2010.2083622http://cds.cern.ch/record/1399774engVerweij, A PLasheras, N CTock, J PWillering, G PSteckert, JPerin, AScheuerlein, CMathot, SKoratzinos, MGarion, CDenz, RFessia, PCharifoulline, ZBertinelli, FSgobba, Sten Kate, H H JConsolidation of the 13 kA Interconnects in the LHC for Operation at 7 TeVXXXXThe accident in the LHC in September 2008 occurred in an interconnection between two magnets of the 13 kA dipole circuit. Successive measurements of the resistance of other interconnects revealed other defective joints, even though the SC cables were properly connected. These defective joints are characterized by a poor bonding between the SC cable and the copper stabilizer in combination with an electrical discontinuity in the copper stabilizer. A quench at the 7-13 kA level in such a joint can lead to a fast and unprotected thermal run-away and hence opening of the circuit. It has therefore been decided to operate the LHC at a reduced and safe current of 6 kA corresponding to 3.5 TeV beam energy until all defective joints are repaired. A task force is reviewing the status of all electrical joints in the magnet circuits and preparing for the necessary repairs. The principle solution is to resolder the worst defective joints and, in addition, to apply an electrical shunt made of copper across all joints with sufficient cross-section to guarantee safe 12-13 kA operation at 7-7.5 TeV. In this paper the various actions that have lead to this solution are presented.oai:cds.cern.ch:13997742011 |
spellingShingle | XX XX Verweij, A P Lasheras, N C Tock, J P Willering, G P Steckert, J Perin, A Scheuerlein, C Mathot, S Koratzinos, M Garion, C Denz, R Fessia, P Charifoulline, Z Bertinelli, F Sgobba, S ten Kate, H H J Consolidation of the 13 kA Interconnects in the LHC for Operation at 7 TeV |
title | Consolidation of the 13 kA Interconnects in the LHC for Operation at 7 TeV |
title_full | Consolidation of the 13 kA Interconnects in the LHC for Operation at 7 TeV |
title_fullStr | Consolidation of the 13 kA Interconnects in the LHC for Operation at 7 TeV |
title_full_unstemmed | Consolidation of the 13 kA Interconnects in the LHC for Operation at 7 TeV |
title_short | Consolidation of the 13 kA Interconnects in the LHC for Operation at 7 TeV |
title_sort | consolidation of the 13 ka interconnects in the lhc for operation at 7 tev |
topic | XX XX |
url | https://dx.doi.org/10.1109/TASC.2010.2083622 http://cds.cern.ch/record/1399774 |
work_keys_str_mv | AT verweijap consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT lasherasnc consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT tockjp consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT willeringgp consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT steckertj consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT perina consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT scheuerleinc consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT mathots consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT koratzinosm consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT garionc consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT denzr consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT fessiap consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT charifoullinez consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT bertinellif consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT sgobbas consolidationofthe13kainterconnectsinthelhcforoperationat7tev AT tenkatehhj consolidationofthe13kainterconnectsinthelhcforoperationat7tev |