Commissioning and Operation of the H4IRRAD Mixed-Field Test Area

This note reports on the commissioning and operation period of the H4IRRAD Test Area in which well characterised mixed-fields are provided for LHC equipment users. In benchmark simulations the mixed-field components were estimated and measured with the H4IRRAD beam and radiation monitoring systems....

Descripción completa

Detalles Bibliográficos
Autores principales: Kwee, R, Biskup, B, Brugger, M, Calviani, M, Efthymiopoulos, I, Mekki, J, La Torre, F, Lebbos, E, Mala, P, Manessi, G, Nordt, A, Pozzi, F, Roeed, K, Severino, C, Silari, M, Thornton, A
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:http://cds.cern.ch/record/1403188
_version_ 1780923722804232192
author Kwee, R
Biskup, B
Brugger, M
Calviani, M
Efthymiopoulos, I
Mekki, J
La Torre, F
Lebbos, E
Mala, P
Manessi, G
Nordt, A
Pozzi, F
Roeed, K
Severino, C
Silari, M
Thornton, A
author_facet Kwee, R
Biskup, B
Brugger, M
Calviani, M
Efthymiopoulos, I
Mekki, J
La Torre, F
Lebbos, E
Mala, P
Manessi, G
Nordt, A
Pozzi, F
Roeed, K
Severino, C
Silari, M
Thornton, A
author_sort Kwee, R
collection CERN
description This note reports on the commissioning and operation period of the H4IRRAD Test Area in which well characterised mixed-fields are provided for LHC equipment users. In benchmark simulations the mixed-field components were estimated and measured with the H4IRRAD beam and radiation monitoring systems. The radiation monitors, the “RadMons” and beam-loss monitors (BLMs) are the same detector types used for monitoring radiation fluences in the underground areas of the LHC. In the first two irradiation periods various equipment was exposed to irradiation produced by a secondary proton beam of 280 GeV impacting on the H4IRRAD copper target. Measurements compared to simulations are presented that quantify the high energy hadron, thermal neutron and Si 1 MeV neutron equivalent fluences at the given test locations. A crucial part was to calibrate the beam monitoring systems to measure the number of protons, p.o.t., which is outlined using different techniques. In addition, cross-checks of p.o.t. measurements are presented using the beam-loss-monitors which agree well within uncertainties.
id cern-1403188
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2011
record_format invenio
spelling cern-14031882019-09-30T06:29:59Zhttp://cds.cern.ch/record/1403188engKwee, RBiskup, BBrugger, MCalviani, MEfthymiopoulos, IMekki, JLa Torre, FLebbos, EMala, PManessi, GNordt, APozzi, FRoeed, KSeverino, CSilari, MThornton, ACommissioning and Operation of the H4IRRAD Mixed-Field Test AreaAccelerators and Storage RingsThis note reports on the commissioning and operation period of the H4IRRAD Test Area in which well characterised mixed-fields are provided for LHC equipment users. In benchmark simulations the mixed-field components were estimated and measured with the H4IRRAD beam and radiation monitoring systems. The radiation monitors, the “RadMons” and beam-loss monitors (BLMs) are the same detector types used for monitoring radiation fluences in the underground areas of the LHC. In the first two irradiation periods various equipment was exposed to irradiation produced by a secondary proton beam of 280 GeV impacting on the H4IRRAD copper target. Measurements compared to simulations are presented that quantify the high energy hadron, thermal neutron and Si 1 MeV neutron equivalent fluences at the given test locations. A crucial part was to calibrate the beam monitoring systems to measure the number of protons, p.o.t., which is outlined using different techniques. In addition, cross-checks of p.o.t. measurements are presented using the beam-loss-monitors which agree well within uncertainties.CERN-ATS-Note-2011-121 PERFoai:cds.cern.ch:14031882011-12-02
spellingShingle Accelerators and Storage Rings
Kwee, R
Biskup, B
Brugger, M
Calviani, M
Efthymiopoulos, I
Mekki, J
La Torre, F
Lebbos, E
Mala, P
Manessi, G
Nordt, A
Pozzi, F
Roeed, K
Severino, C
Silari, M
Thornton, A
Commissioning and Operation of the H4IRRAD Mixed-Field Test Area
title Commissioning and Operation of the H4IRRAD Mixed-Field Test Area
title_full Commissioning and Operation of the H4IRRAD Mixed-Field Test Area
title_fullStr Commissioning and Operation of the H4IRRAD Mixed-Field Test Area
title_full_unstemmed Commissioning and Operation of the H4IRRAD Mixed-Field Test Area
title_short Commissioning and Operation of the H4IRRAD Mixed-Field Test Area
title_sort commissioning and operation of the h4irrad mixed-field test area
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1403188
work_keys_str_mv AT kweer commissioningandoperationoftheh4irradmixedfieldtestarea
AT biskupb commissioningandoperationoftheh4irradmixedfieldtestarea
AT bruggerm commissioningandoperationoftheh4irradmixedfieldtestarea
AT calvianim commissioningandoperationoftheh4irradmixedfieldtestarea
AT efthymiopoulosi commissioningandoperationoftheh4irradmixedfieldtestarea
AT mekkij commissioningandoperationoftheh4irradmixedfieldtestarea
AT latorref commissioningandoperationoftheh4irradmixedfieldtestarea
AT lebbose commissioningandoperationoftheh4irradmixedfieldtestarea
AT malap commissioningandoperationoftheh4irradmixedfieldtestarea
AT manessig commissioningandoperationoftheh4irradmixedfieldtestarea
AT nordta commissioningandoperationoftheh4irradmixedfieldtestarea
AT pozzif commissioningandoperationoftheh4irradmixedfieldtestarea
AT roeedk commissioningandoperationoftheh4irradmixedfieldtestarea
AT severinoc commissioningandoperationoftheh4irradmixedfieldtestarea
AT silarim commissioningandoperationoftheh4irradmixedfieldtestarea
AT thorntona commissioningandoperationoftheh4irradmixedfieldtestarea