Commissioning and Operation of the H4IRRAD Mixed-Field Test Area
This note reports on the commissioning and operation period of the H4IRRAD Test Area in which well characterised mixed-fields are provided for LHC equipment users. In benchmark simulations the mixed-field components were estimated and measured with the H4IRRAD beam and radiation monitoring systems....
Autores principales: | , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1403188 |
_version_ | 1780923722804232192 |
---|---|
author | Kwee, R Biskup, B Brugger, M Calviani, M Efthymiopoulos, I Mekki, J La Torre, F Lebbos, E Mala, P Manessi, G Nordt, A Pozzi, F Roeed, K Severino, C Silari, M Thornton, A |
author_facet | Kwee, R Biskup, B Brugger, M Calviani, M Efthymiopoulos, I Mekki, J La Torre, F Lebbos, E Mala, P Manessi, G Nordt, A Pozzi, F Roeed, K Severino, C Silari, M Thornton, A |
author_sort | Kwee, R |
collection | CERN |
description | This note reports on the commissioning and operation period of the H4IRRAD Test Area in which well characterised mixed-fields are provided for LHC equipment users. In benchmark simulations the mixed-field components were estimated and measured with the H4IRRAD beam and radiation monitoring systems. The radiation monitors, the “RadMons” and beam-loss monitors (BLMs) are the same detector types used for monitoring radiation fluences in the underground areas of the LHC. In the first two irradiation periods various equipment was exposed to irradiation produced by a secondary proton beam of 280 GeV impacting on the H4IRRAD copper target. Measurements compared to simulations are presented that quantify the high energy hadron, thermal neutron and Si 1 MeV neutron equivalent fluences at the given test locations. A crucial part was to calibrate the beam monitoring systems to measure the number of protons, p.o.t., which is outlined using different techniques. In addition, cross-checks of p.o.t. measurements are presented using the beam-loss-monitors which agree well within uncertainties. |
id | cern-1403188 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-14031882019-09-30T06:29:59Zhttp://cds.cern.ch/record/1403188engKwee, RBiskup, BBrugger, MCalviani, MEfthymiopoulos, IMekki, JLa Torre, FLebbos, EMala, PManessi, GNordt, APozzi, FRoeed, KSeverino, CSilari, MThornton, ACommissioning and Operation of the H4IRRAD Mixed-Field Test AreaAccelerators and Storage RingsThis note reports on the commissioning and operation period of the H4IRRAD Test Area in which well characterised mixed-fields are provided for LHC equipment users. In benchmark simulations the mixed-field components were estimated and measured with the H4IRRAD beam and radiation monitoring systems. The radiation monitors, the “RadMons” and beam-loss monitors (BLMs) are the same detector types used for monitoring radiation fluences in the underground areas of the LHC. In the first two irradiation periods various equipment was exposed to irradiation produced by a secondary proton beam of 280 GeV impacting on the H4IRRAD copper target. Measurements compared to simulations are presented that quantify the high energy hadron, thermal neutron and Si 1 MeV neutron equivalent fluences at the given test locations. A crucial part was to calibrate the beam monitoring systems to measure the number of protons, p.o.t., which is outlined using different techniques. In addition, cross-checks of p.o.t. measurements are presented using the beam-loss-monitors which agree well within uncertainties.CERN-ATS-Note-2011-121 PERFoai:cds.cern.ch:14031882011-12-02 |
spellingShingle | Accelerators and Storage Rings Kwee, R Biskup, B Brugger, M Calviani, M Efthymiopoulos, I Mekki, J La Torre, F Lebbos, E Mala, P Manessi, G Nordt, A Pozzi, F Roeed, K Severino, C Silari, M Thornton, A Commissioning and Operation of the H4IRRAD Mixed-Field Test Area |
title | Commissioning and Operation of the H4IRRAD Mixed-Field Test Area |
title_full | Commissioning and Operation of the H4IRRAD Mixed-Field Test Area |
title_fullStr | Commissioning and Operation of the H4IRRAD Mixed-Field Test Area |
title_full_unstemmed | Commissioning and Operation of the H4IRRAD Mixed-Field Test Area |
title_short | Commissioning and Operation of the H4IRRAD Mixed-Field Test Area |
title_sort | commissioning and operation of the h4irrad mixed-field test area |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1403188 |
work_keys_str_mv | AT kweer commissioningandoperationoftheh4irradmixedfieldtestarea AT biskupb commissioningandoperationoftheh4irradmixedfieldtestarea AT bruggerm commissioningandoperationoftheh4irradmixedfieldtestarea AT calvianim commissioningandoperationoftheh4irradmixedfieldtestarea AT efthymiopoulosi commissioningandoperationoftheh4irradmixedfieldtestarea AT mekkij commissioningandoperationoftheh4irradmixedfieldtestarea AT latorref commissioningandoperationoftheh4irradmixedfieldtestarea AT lebbose commissioningandoperationoftheh4irradmixedfieldtestarea AT malap commissioningandoperationoftheh4irradmixedfieldtestarea AT manessig commissioningandoperationoftheh4irradmixedfieldtestarea AT nordta commissioningandoperationoftheh4irradmixedfieldtestarea AT pozzif commissioningandoperationoftheh4irradmixedfieldtestarea AT roeedk commissioningandoperationoftheh4irradmixedfieldtestarea AT severinoc commissioningandoperationoftheh4irradmixedfieldtestarea AT silarim commissioningandoperationoftheh4irradmixedfieldtestarea AT thorntona commissioningandoperationoftheh4irradmixedfieldtestarea |