HiRadMat High Intensity Beam Commissioning
On Wednesday 14 September and Monday 19 September 2011, high intensity proton beam was sent for the first time down the HiRadMat primary beam line (thereafter TT66), onto the beam dump located in the HiRadMat experimental cavern. This high intensity beam commissioning followed a first period of low...
Autores principales: | Blanco Sancho, J, Conan, N, Cornelis, K, Goddard, B, Hessler, C, Jensen, L, Kain, V, Meddahi, M, Theis, C, Vincke, H, Vojtyla, P, Wenninger, J |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1404241 |
Ejemplares similares
-
HiRadMat Low Intensity Beam Commissioning
por: Blanco Sancho, J, et al.
Publicado: (2011) -
Results from the HiRadMat Primary Beam Line Commissioning
por: Hessler, C, et al.
Publicado: (2011) -
The Final Beam Line Design for the HiRadMat Test Facility
por: Hessler, C, et al.
Publicado: (2010) -
HiRadMat: A New Irradiation Facility for Material Testing at CERN
por: Efthymiopoulos, I, et al.
Publicado: (2011) -
photos of HiRadMat
por: Krajewski, Yann
Publicado: (2015)