Cargando…

Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011

During the 2011 LHC operation, the abort gap cleaning has successfully being used at 450 GeV. The design goal of this system is to leave it active all along the LHC operational cycles, from the injection to the end of the stable beams operation. Therefore, during fall 2011, abort gap cleaning tests...

Descripción completa

Detalles Bibliográficos
Autores principales: Boccardi, A, Bravin, E, Gianfelice, E, Goddard, B, Höfle, W, Jeff, A, Kain, V, Meddahi, M, Roncarolo, F, Uythoven, J, Valuch, D
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:http://cds.cern.ch/record/1404280
_version_ 1780923740825059328
author Boccardi, A
Bravin, E
Gianfelice, E
Goddard, B
Höfle, W
Jeff, A
Kain, V
Meddahi, M
Roncarolo, F
Uythoven, J
Valuch, D
author_facet Boccardi, A
Bravin, E
Gianfelice, E
Goddard, B
Höfle, W
Jeff, A
Kain, V
Meddahi, M
Roncarolo, F
Uythoven, J
Valuch, D
author_sort Boccardi, A
collection CERN
description During the 2011 LHC operation, the abort gap cleaning has successfully being used at 450 GeV. The design goal of this system is to leave it active all along the LHC operational cycles, from the injection to the end of the stable beams operation. Therefore, during fall 2011, abort gap cleaning tests continued at 3.5 TeV. In this note, the results of the successful beam cleaning performed on October 7, 2011 are summarised.
id cern-1404280
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2011
record_format invenio
spelling cern-14042802019-09-30T06:29:59Zhttp://cds.cern.ch/record/1404280engBoccardi, ABravin, EGianfelice, EGoddard, BHöfle, WJeff, AKain, VMeddahi, MRoncarolo, FUythoven, JValuch, DSummary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011Accelerators and Storage RingsDuring the 2011 LHC operation, the abort gap cleaning has successfully being used at 450 GeV. The design goal of this system is to leave it active all along the LHC operational cycles, from the injection to the end of the stable beams operation. Therefore, during fall 2011, abort gap cleaning tests continued at 3.5 TeV. In this note, the results of the successful beam cleaning performed on October 7, 2011 are summarised.CERN-ATS-Note-2011-128 PERFoai:cds.cern.ch:14042802011-12-02
spellingShingle Accelerators and Storage Rings
Boccardi, A
Bravin, E
Gianfelice, E
Goddard, B
Höfle, W
Jeff, A
Kain, V
Meddahi, M
Roncarolo, F
Uythoven, J
Valuch, D
Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011
title Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011
title_full Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011
title_fullStr Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011
title_full_unstemmed Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011
title_short Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011
title_sort summary of abort gap cleaning tests performed at 3.5 tev on october,7 2011
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1404280
work_keys_str_mv AT boccardia summaryofabortgapcleaningtestsperformedat35tevonoctober72011
AT bravine summaryofabortgapcleaningtestsperformedat35tevonoctober72011
AT gianfelicee summaryofabortgapcleaningtestsperformedat35tevonoctober72011
AT goddardb summaryofabortgapcleaningtestsperformedat35tevonoctober72011
AT hoflew summaryofabortgapcleaningtestsperformedat35tevonoctober72011
AT jeffa summaryofabortgapcleaningtestsperformedat35tevonoctober72011
AT kainv summaryofabortgapcleaningtestsperformedat35tevonoctober72011
AT meddahim summaryofabortgapcleaningtestsperformedat35tevonoctober72011
AT roncarolof summaryofabortgapcleaningtestsperformedat35tevonoctober72011
AT uythovenj summaryofabortgapcleaningtestsperformedat35tevonoctober72011
AT valuchd summaryofabortgapcleaningtestsperformedat35tevonoctober72011