Cargando…
Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011
During the 2011 LHC operation, the abort gap cleaning has successfully being used at 450 GeV. The design goal of this system is to leave it active all along the LHC operational cycles, from the injection to the end of the stable beams operation. Therefore, during fall 2011, abort gap cleaning tests...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1404280 |
_version_ | 1780923740825059328 |
---|---|
author | Boccardi, A Bravin, E Gianfelice, E Goddard, B Höfle, W Jeff, A Kain, V Meddahi, M Roncarolo, F Uythoven, J Valuch, D |
author_facet | Boccardi, A Bravin, E Gianfelice, E Goddard, B Höfle, W Jeff, A Kain, V Meddahi, M Roncarolo, F Uythoven, J Valuch, D |
author_sort | Boccardi, A |
collection | CERN |
description | During the 2011 LHC operation, the abort gap cleaning has successfully being used at 450 GeV. The design goal of this system is to leave it active all along the LHC operational cycles, from the injection to the end of the stable beams operation. Therefore, during fall 2011, abort gap cleaning tests continued at 3.5 TeV. In this note, the results of the successful beam cleaning performed on October 7, 2011 are summarised. |
id | cern-1404280 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-14042802019-09-30T06:29:59Zhttp://cds.cern.ch/record/1404280engBoccardi, ABravin, EGianfelice, EGoddard, BHöfle, WJeff, AKain, VMeddahi, MRoncarolo, FUythoven, JValuch, DSummary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011Accelerators and Storage RingsDuring the 2011 LHC operation, the abort gap cleaning has successfully being used at 450 GeV. The design goal of this system is to leave it active all along the LHC operational cycles, from the injection to the end of the stable beams operation. Therefore, during fall 2011, abort gap cleaning tests continued at 3.5 TeV. In this note, the results of the successful beam cleaning performed on October 7, 2011 are summarised.CERN-ATS-Note-2011-128 PERFoai:cds.cern.ch:14042802011-12-02 |
spellingShingle | Accelerators and Storage Rings Boccardi, A Bravin, E Gianfelice, E Goddard, B Höfle, W Jeff, A Kain, V Meddahi, M Roncarolo, F Uythoven, J Valuch, D Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011 |
title | Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011 |
title_full | Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011 |
title_fullStr | Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011 |
title_full_unstemmed | Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011 |
title_short | Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011 |
title_sort | summary of abort gap cleaning tests performed at 3.5 tev on october,7 2011 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1404280 |
work_keys_str_mv | AT boccardia summaryofabortgapcleaningtestsperformedat35tevonoctober72011 AT bravine summaryofabortgapcleaningtestsperformedat35tevonoctober72011 AT gianfelicee summaryofabortgapcleaningtestsperformedat35tevonoctober72011 AT goddardb summaryofabortgapcleaningtestsperformedat35tevonoctober72011 AT hoflew summaryofabortgapcleaningtestsperformedat35tevonoctober72011 AT jeffa summaryofabortgapcleaningtestsperformedat35tevonoctober72011 AT kainv summaryofabortgapcleaningtestsperformedat35tevonoctober72011 AT meddahim summaryofabortgapcleaningtestsperformedat35tevonoctober72011 AT roncarolof summaryofabortgapcleaningtestsperformedat35tevonoctober72011 AT uythovenj summaryofabortgapcleaningtestsperformedat35tevonoctober72011 AT valuchd summaryofabortgapcleaningtestsperformedat35tevonoctober72011 |