BI MD studies on August 25th 2011
This note contains the preliminary results of the LHC MD that took place on 25-Aug-2011 (from 5 a.m. to 1 p.m.), dedicated to study Beam Loss Monitors (BLM), Wire Scanners (WS), Synchrotron Radiation (BSRT), Beam Position Monitors (BPM), and Beam Gas Ionization (BGI) monitors. The MD aimed at perfor...
Autores principales: | , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1405423 |
Sumario: | This note contains the preliminary results of the LHC MD that took place on 25-Aug-2011 (from 5 a.m. to 1 p.m.), dedicated to study Beam Loss Monitors (BLM), Wire Scanners (WS), Synchrotron Radiation (BSRT), Beam Position Monitors (BPM), and Beam Gas Ionization (BGI) monitors. The MD aimed at performing different studies on the individual monitors. |
---|