Results from the HiRadMat Primary Beam Line Commissioning

The High Radiation to Materials facility (HiRadMat) is a new experimental area at CERN, for studies of the impact of high-intensity pulsed beams on accelerator components and materials. The beam is delivered from the SPS by a new primary beam line, which has been constructed during the 2010/11 winte...

Descripción completa

Detalles Bibliográficos
Autores principales: Hessler, C, Arruat, M, Bauche, J, Bestmann, K, Blanco Sancho, J, Conan, N, Cornelis, K, Efthymiopoulos, I, Gaillard, H, Goddard, B, Grenier, D, Gros, G, Habert, A, Jensen, L, Kain, V, Le Godec, G, Meddahi, M, Pelletier, S, Pepinster, P, Puccio, B, Theis, C, Trilhe, P, Vandoni, G, Wenninger, J
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:http://cds.cern.ch/record/1407941
_version_ 1780923817352232960
author Hessler, C
Arruat, M
Bauche, J
Bestmann, K
Blanco Sancho, J
Conan, N
Cornelis, K
Efthymiopoulos, I
Gaillard, H
Goddard, B
Grenier, D
Gros, G
Habert, A
Jensen, L
Kain, V
Le Godec, G
Meddahi, M
Pelletier, S
Pepinster, P
Puccio, B
Theis, C
Trilhe, P
Vandoni, G
Wenninger, J
author_facet Hessler, C
Arruat, M
Bauche, J
Bestmann, K
Blanco Sancho, J
Conan, N
Cornelis, K
Efthymiopoulos, I
Gaillard, H
Goddard, B
Grenier, D
Gros, G
Habert, A
Jensen, L
Kain, V
Le Godec, G
Meddahi, M
Pelletier, S
Pepinster, P
Puccio, B
Theis, C
Trilhe, P
Vandoni, G
Wenninger, J
author_sort Hessler, C
collection CERN
description The High Radiation to Materials facility (HiRadMat) is a new experimental area at CERN, for studies of the impact of high-intensity pulsed beams on accelerator components and materials. The beam is delivered from the SPS by a new primary beam line, which has been constructed during the 2010/11 winter technical stop. The paper summarizes the construction phase and describes the results from the beam line commissioning in spring 2011. Beam parameter and aperture measurements are presented, as well as steering tests. A special emphasis has been put on the handling of the exceptionally flexible beam line optics in the control system.
id cern-1407941
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2011
record_format invenio
spelling cern-14079412022-08-17T13:32:28Zhttp://cds.cern.ch/record/1407941engHessler, CArruat, MBauche, JBestmann, KBlanco Sancho, JConan, NCornelis, KEfthymiopoulos, IGaillard, HGoddard, BGrenier, DGros, GHabert, AJensen, LKain, VLe Godec, GMeddahi, MPelletier, SPepinster, PPuccio, BTheis, CTrilhe, PVandoni, GWenninger, JResults from the HiRadMat Primary Beam Line CommissioningAccelerators and Storage RingsThe High Radiation to Materials facility (HiRadMat) is a new experimental area at CERN, for studies of the impact of high-intensity pulsed beams on accelerator components and materials. The beam is delivered from the SPS by a new primary beam line, which has been constructed during the 2010/11 winter technical stop. The paper summarizes the construction phase and describes the results from the beam line commissioning in spring 2011. Beam parameter and aperture measurements are presented, as well as steering tests. A special emphasis has been put on the handling of the exceptionally flexible beam line optics in the control system.CERN-ATS-2011-272oai:cds.cern.ch:14079412011-12-01
spellingShingle Accelerators and Storage Rings
Hessler, C
Arruat, M
Bauche, J
Bestmann, K
Blanco Sancho, J
Conan, N
Cornelis, K
Efthymiopoulos, I
Gaillard, H
Goddard, B
Grenier, D
Gros, G
Habert, A
Jensen, L
Kain, V
Le Godec, G
Meddahi, M
Pelletier, S
Pepinster, P
Puccio, B
Theis, C
Trilhe, P
Vandoni, G
Wenninger, J
Results from the HiRadMat Primary Beam Line Commissioning
title Results from the HiRadMat Primary Beam Line Commissioning
title_full Results from the HiRadMat Primary Beam Line Commissioning
title_fullStr Results from the HiRadMat Primary Beam Line Commissioning
title_full_unstemmed Results from the HiRadMat Primary Beam Line Commissioning
title_short Results from the HiRadMat Primary Beam Line Commissioning
title_sort results from the hiradmat primary beam line commissioning
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1407941
work_keys_str_mv AT hesslerc resultsfromthehiradmatprimarybeamlinecommissioning
AT arruatm resultsfromthehiradmatprimarybeamlinecommissioning
AT bauchej resultsfromthehiradmatprimarybeamlinecommissioning
AT bestmannk resultsfromthehiradmatprimarybeamlinecommissioning
AT blancosanchoj resultsfromthehiradmatprimarybeamlinecommissioning
AT conann resultsfromthehiradmatprimarybeamlinecommissioning
AT cornelisk resultsfromthehiradmatprimarybeamlinecommissioning
AT efthymiopoulosi resultsfromthehiradmatprimarybeamlinecommissioning
AT gaillardh resultsfromthehiradmatprimarybeamlinecommissioning
AT goddardb resultsfromthehiradmatprimarybeamlinecommissioning
AT grenierd resultsfromthehiradmatprimarybeamlinecommissioning
AT grosg resultsfromthehiradmatprimarybeamlinecommissioning
AT haberta resultsfromthehiradmatprimarybeamlinecommissioning
AT jensenl resultsfromthehiradmatprimarybeamlinecommissioning
AT kainv resultsfromthehiradmatprimarybeamlinecommissioning
AT legodecg resultsfromthehiradmatprimarybeamlinecommissioning
AT meddahim resultsfromthehiradmatprimarybeamlinecommissioning
AT pelletiers resultsfromthehiradmatprimarybeamlinecommissioning
AT pepinsterp resultsfromthehiradmatprimarybeamlinecommissioning
AT pucciob resultsfromthehiradmatprimarybeamlinecommissioning
AT theisc resultsfromthehiradmatprimarybeamlinecommissioning
AT trilhep resultsfromthehiradmatprimarybeamlinecommissioning
AT vandonig resultsfromthehiradmatprimarybeamlinecommissioning
AT wenningerj resultsfromthehiradmatprimarybeamlinecommissioning