Results from the HiRadMat Primary Beam Line Commissioning
The High Radiation to Materials facility (HiRadMat) is a new experimental area at CERN, for studies of the impact of high-intensity pulsed beams on accelerator components and materials. The beam is delivered from the SPS by a new primary beam line, which has been constructed during the 2010/11 winte...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1407941 |
_version_ | 1780923817352232960 |
---|---|
author | Hessler, C Arruat, M Bauche, J Bestmann, K Blanco Sancho, J Conan, N Cornelis, K Efthymiopoulos, I Gaillard, H Goddard, B Grenier, D Gros, G Habert, A Jensen, L Kain, V Le Godec, G Meddahi, M Pelletier, S Pepinster, P Puccio, B Theis, C Trilhe, P Vandoni, G Wenninger, J |
author_facet | Hessler, C Arruat, M Bauche, J Bestmann, K Blanco Sancho, J Conan, N Cornelis, K Efthymiopoulos, I Gaillard, H Goddard, B Grenier, D Gros, G Habert, A Jensen, L Kain, V Le Godec, G Meddahi, M Pelletier, S Pepinster, P Puccio, B Theis, C Trilhe, P Vandoni, G Wenninger, J |
author_sort | Hessler, C |
collection | CERN |
description | The High Radiation to Materials facility (HiRadMat) is a new experimental area at CERN, for studies of the impact of high-intensity pulsed beams on accelerator components and materials. The beam is delivered from the SPS by a new primary beam line, which has been constructed during the 2010/11 winter technical stop. The paper summarizes the construction phase and describes the results from the beam line commissioning in spring 2011. Beam parameter and aperture measurements are presented, as well as steering tests. A special emphasis has been put on the handling of the exceptionally flexible beam line optics in the control system. |
id | cern-1407941 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-14079412022-08-17T13:32:28Zhttp://cds.cern.ch/record/1407941engHessler, CArruat, MBauche, JBestmann, KBlanco Sancho, JConan, NCornelis, KEfthymiopoulos, IGaillard, HGoddard, BGrenier, DGros, GHabert, AJensen, LKain, VLe Godec, GMeddahi, MPelletier, SPepinster, PPuccio, BTheis, CTrilhe, PVandoni, GWenninger, JResults from the HiRadMat Primary Beam Line CommissioningAccelerators and Storage RingsThe High Radiation to Materials facility (HiRadMat) is a new experimental area at CERN, for studies of the impact of high-intensity pulsed beams on accelerator components and materials. The beam is delivered from the SPS by a new primary beam line, which has been constructed during the 2010/11 winter technical stop. The paper summarizes the construction phase and describes the results from the beam line commissioning in spring 2011. Beam parameter and aperture measurements are presented, as well as steering tests. A special emphasis has been put on the handling of the exceptionally flexible beam line optics in the control system.CERN-ATS-2011-272oai:cds.cern.ch:14079412011-12-01 |
spellingShingle | Accelerators and Storage Rings Hessler, C Arruat, M Bauche, J Bestmann, K Blanco Sancho, J Conan, N Cornelis, K Efthymiopoulos, I Gaillard, H Goddard, B Grenier, D Gros, G Habert, A Jensen, L Kain, V Le Godec, G Meddahi, M Pelletier, S Pepinster, P Puccio, B Theis, C Trilhe, P Vandoni, G Wenninger, J Results from the HiRadMat Primary Beam Line Commissioning |
title | Results from the HiRadMat Primary Beam Line Commissioning |
title_full | Results from the HiRadMat Primary Beam Line Commissioning |
title_fullStr | Results from the HiRadMat Primary Beam Line Commissioning |
title_full_unstemmed | Results from the HiRadMat Primary Beam Line Commissioning |
title_short | Results from the HiRadMat Primary Beam Line Commissioning |
title_sort | results from the hiradmat primary beam line commissioning |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1407941 |
work_keys_str_mv | AT hesslerc resultsfromthehiradmatprimarybeamlinecommissioning AT arruatm resultsfromthehiradmatprimarybeamlinecommissioning AT bauchej resultsfromthehiradmatprimarybeamlinecommissioning AT bestmannk resultsfromthehiradmatprimarybeamlinecommissioning AT blancosanchoj resultsfromthehiradmatprimarybeamlinecommissioning AT conann resultsfromthehiradmatprimarybeamlinecommissioning AT cornelisk resultsfromthehiradmatprimarybeamlinecommissioning AT efthymiopoulosi resultsfromthehiradmatprimarybeamlinecommissioning AT gaillardh resultsfromthehiradmatprimarybeamlinecommissioning AT goddardb resultsfromthehiradmatprimarybeamlinecommissioning AT grenierd resultsfromthehiradmatprimarybeamlinecommissioning AT grosg resultsfromthehiradmatprimarybeamlinecommissioning AT haberta resultsfromthehiradmatprimarybeamlinecommissioning AT jensenl resultsfromthehiradmatprimarybeamlinecommissioning AT kainv resultsfromthehiradmatprimarybeamlinecommissioning AT legodecg resultsfromthehiradmatprimarybeamlinecommissioning AT meddahim resultsfromthehiradmatprimarybeamlinecommissioning AT pelletiers resultsfromthehiradmatprimarybeamlinecommissioning AT pepinsterp resultsfromthehiradmatprimarybeamlinecommissioning AT pucciob resultsfromthehiradmatprimarybeamlinecommissioning AT theisc resultsfromthehiradmatprimarybeamlinecommissioning AT trilhep resultsfromthehiradmatprimarybeamlinecommissioning AT vandonig resultsfromthehiradmatprimarybeamlinecommissioning AT wenningerj resultsfromthehiradmatprimarybeamlinecommissioning |