Cargando…
Results from the HiRadMat Primary Beam Line Commissioning
The High Radiation to Materials facility (HiRadMat) is a new experimental area at CERN, for studies of the impact of high-intensity pulsed beams on accelerator components and materials. The beam is delivered from the SPS by a new primary beam line, which has been constructed during the 2010/11 winte...
Autores principales: | Hessler, C, Arruat, M, Bauche, J, Bestmann, K, Blanco Sancho, J, Conan, N, Cornelis, K, Efthymiopoulos, I, Gaillard, H, Goddard, B, Grenier, D, Gros, G, Habert, A, Jensen, L, Kain, V, Le Godec, G, Meddahi, M, Pelletier, S, Pepinster, P, Puccio, B, Theis, C, Trilhe, P, Vandoni, G, Wenninger, J |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1407941 |
Ejemplares similares
-
HiRadMat Low Intensity Beam Commissioning
por: Blanco Sancho, J, et al.
Publicado: (2011) -
HiRadMat High Intensity Beam Commissioning
por: Blanco Sancho, J, et al.
Publicado: (2011) -
HiRadMat: A New Irradiation Facility for Material Testing at CERN
por: Efthymiopoulos, I, et al.
Publicado: (2011) -
The Final Beam Line Design for the HiRadMat Test Facility
por: Hessler, C, et al.
Publicado: (2010) -
First Year of Operations in the HiRadMat Irradiation Facility at CERN
por: Fabich, A, et al.
Publicado: (2013)