Abort Gap Cleaning tests performed on 13 October 2011 during luminosity operation

Following the abort gap cleaning tests performed on 7 October 2011 [1] additional tests were carried out on 13 October 2011 to further investigate the effects of the cleaning on the luminosity production. The abort gap cleaning parameters (strength and duration of the beam excitation kick) were vari...

Descripción completa

Detalles Bibliográficos
Autores principales: Boccardi, A, Bravin, E, Jeff, A, Roncarolo, F, Höfle, W, Valuch, D, Kain, V, Goddard, B, Meddahi, M, Uythoven, J, Gianfelice-Wendt, E
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1411357
_version_ 1780923846654689280
author Boccardi, A
Bravin, E
Jeff, A
Roncarolo, F
Höfle, W
Valuch, D
Kain, V
Goddard, B
Meddahi, M
Uythoven, J
Gianfelice-Wendt, E
author_facet Boccardi, A
Bravin, E
Jeff, A
Roncarolo, F
Höfle, W
Valuch, D
Kain, V
Goddard, B
Meddahi, M
Uythoven, J
Gianfelice-Wendt, E
author_sort Boccardi, A
collection CERN
description Following the abort gap cleaning tests performed on 7 October 2011 [1] additional tests were carried out on 13 October 2011 to further investigate the effects of the cleaning on the luminosity production. The abort gap cleaning parameters (strength and duration of the beam excitation kick) were varied and the cleaning effectiveness measured together with the change in luminosity. The outcome is summarised in this note.
id cern-1411357
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14113572019-09-30T06:29:59Zhttp://cds.cern.ch/record/1411357engBoccardi, ABravin, EJeff, ARoncarolo, FHöfle, WValuch, DKain, VGoddard, BMeddahi, MUythoven, JGianfelice-Wendt, EAbort Gap Cleaning tests performed on 13 October 2011 during luminosity operationAccelerators and Storage RingsFollowing the abort gap cleaning tests performed on 7 October 2011 [1] additional tests were carried out on 13 October 2011 to further investigate the effects of the cleaning on the luminosity production. The abort gap cleaning parameters (strength and duration of the beam excitation kick) were varied and the cleaning effectiveness measured together with the change in luminosity. The outcome is summarised in this note.CERN-ATS-Note-2012-001 PERFoai:cds.cern.ch:14113572012-01-05
spellingShingle Accelerators and Storage Rings
Boccardi, A
Bravin, E
Jeff, A
Roncarolo, F
Höfle, W
Valuch, D
Kain, V
Goddard, B
Meddahi, M
Uythoven, J
Gianfelice-Wendt, E
Abort Gap Cleaning tests performed on 13 October 2011 during luminosity operation
title Abort Gap Cleaning tests performed on 13 October 2011 during luminosity operation
title_full Abort Gap Cleaning tests performed on 13 October 2011 during luminosity operation
title_fullStr Abort Gap Cleaning tests performed on 13 October 2011 during luminosity operation
title_full_unstemmed Abort Gap Cleaning tests performed on 13 October 2011 during luminosity operation
title_short Abort Gap Cleaning tests performed on 13 October 2011 during luminosity operation
title_sort abort gap cleaning tests performed on 13 october 2011 during luminosity operation
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1411357
work_keys_str_mv AT boccardia abortgapcleaningtestsperformedon13october2011duringluminosityoperation
AT bravine abortgapcleaningtestsperformedon13october2011duringluminosityoperation
AT jeffa abortgapcleaningtestsperformedon13october2011duringluminosityoperation
AT roncarolof abortgapcleaningtestsperformedon13october2011duringluminosityoperation
AT hoflew abortgapcleaningtestsperformedon13october2011duringluminosityoperation
AT valuchd abortgapcleaningtestsperformedon13october2011duringluminosityoperation
AT kainv abortgapcleaningtestsperformedon13october2011duringluminosityoperation
AT goddardb abortgapcleaningtestsperformedon13october2011duringluminosityoperation
AT meddahim abortgapcleaningtestsperformedon13october2011duringluminosityoperation
AT uythovenj abortgapcleaningtestsperformedon13october2011duringluminosityoperation
AT gianfelicewendte abortgapcleaningtestsperformedon13october2011duringluminosityoperation