Abort Gap Cleaning tests performed on 13 October 2011 during luminosity operation
Following the abort gap cleaning tests performed on 7 October 2011 [1] additional tests were carried out on 13 October 2011 to further investigate the effects of the cleaning on the luminosity production. The abort gap cleaning parameters (strength and duration of the beam excitation kick) were vari...
Autores principales: | Boccardi, A, Bravin, E, Jeff, A, Roncarolo, F, Höfle, W, Valuch, D, Kain, V, Goddard, B, Meddahi, M, Uythoven, J, Gianfelice-Wendt, E |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1411357 |
Ejemplares similares
-
Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011
por: Boccardi, A, et al.
Publicado: (2011) -
LHC abort gap cleaning studies during luminosity operation
por: Bartmann, W, et al.
Publicado: (2012) -
Summary of the abort gap cleaning tests performed on October 18, 2010
por: Bart Pedersen, S, et al.
Publicado: (2010) -
Summary of the abort gap cleaning tests performed on October 18, 2010
por: Boccardi, A, et al.
Publicado: (2010) -
Abort Gap Cleaning for LHC Run 2
por: Uythoven, Jan, et al.
Publicado: (2014)