Commissioning of the betatron squeeze to 1 m in IR1 and IR5

This note summarizes the commissioning of the betatron squeeze from 1.5 m to 1 m performed during MD3. The MD3 work included measurements of the optics, setting up of the collimation system for tight settings, validation of the collimation settings and a test ramp with higher intensity to probe long...

Descripción completa

Detalles Bibliográficos
Autores principales: Assmann, R, Bruce, R, Giovannozzi, M, Lamont, M, Maclean, E, Miyamoto, R, Mueller, G, Papotti, G, Ponce, L, Redaelli, S, Tomas, R, Vanbavinckhove, G, Wenninger, J