Commissioning of the betatron squeeze to 1 m in IR1 and IR5
This note summarizes the commissioning of the betatron squeeze from 1.5 m to 1 m performed during MD3. The MD3 work included measurements of the optics, setting up of the collimation system for tight settings, validation of the collimation settings and a test ramp with higher intensity to probe long...