Cargando…
Commissioning of the betatron squeeze to 1 m in IR1 and IR5
This note summarizes the commissioning of the betatron squeeze from 1.5 m to 1 m performed during MD3. The MD3 work included measurements of the optics, setting up of the collimation system for tight settings, validation of the collimation settings and a test ramp with higher intensity to probe long...
Autores principales: | Assmann, R, Bruce, R, Giovannozzi, M, Lamont, M, Maclean, E, Miyamoto, R, Mueller, G, Papotti, G, Ponce, L, Redaelli, S, Tomas, R, Vanbavinckhove, G, Wenninger, J |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1417188 |
Ejemplares similares
-
IR1 and IR5 aperture at 3.5 TeV
por: Alabau Pons, C, et al.
Publicado: (2011) -
Operation of the Betatron Squeeze at the LHC
por: Redaelli, S, et al.
Publicado: (2013) -
Betatron squeeze: status, strategy and issues
por: Lamont, M, et al.
Publicado: (2010) -
IR2 aperture measurements at 3.5 TeV
por: Alabau Pons, C, et al.
Publicado: (2012) -
The Achromatic Telescopic Squeezing (ATS) MD part II
por: Fartoukh, S, et al.
Publicado: (2011)