Cargando…

RF Observations during High Single Bunch Intensity MD

An MD was conducted on June 29th 2011 to setup the RF and ADT for high intensity bunches and to test the beam stability with the resulting congurations. Bunches up to 2.85e11 p were injected to the LHC with nominal RF settings for at bottom. No evidence of longitudinal instability was observed.

Detalles Bibliográficos
Autores principales: Baudrenghien, p, Mastoridis, T
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1424394

Ejemplares similares