Development of a New Insulation Approach for the LHC Main 13 kA Interconnection Splices

In the long LHC (Large Hadron Collider) shutdown in 2013 it is foreseen to intervene on all the 13 kA interconnections in order to guarantee the necessary margin and redundancy to provide safe LHC operation at 7 TeV per beam. This implies reinforcement of the present interconnection configuration in...

Descripción completa

Detalles Bibliográficos
Autores principales: Lackner, F, Bertinelli, F, Fessia, P, Lopez, R, Prin, H, Tock, J Ph
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2011.2178978
http://cds.cern.ch/record/1425492
_version_ 1780924237842743296
author Lackner, F
Bertinelli, F
Fessia, P
Lopez, R
Prin, H
Tock, J Ph
author_facet Lackner, F
Bertinelli, F
Fessia, P
Lopez, R
Prin, H
Tock, J Ph
author_sort Lackner, F
collection CERN
description In the long LHC (Large Hadron Collider) shutdown in 2013 it is foreseen to intervene on all the 13 kA interconnections in order to guarantee the necessary margin and redundancy to provide safe LHC operation at 7 TeV per beam. This implies reinforcement of the present interconnection configuration including a new insulation scheme of the busbars. The purpose of the new insulation model is to provide dielectric insulation with at least the same performance as its predecessor currently installed in the LHC machine, but in addition to contain the Lorentz forces. This paper describes the analytic and empirical approach of development to reach a new insulation concept based on state of the art materials and manufacturing techniques.
id cern-1425492
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14254922019-09-30T06:29:59Zdoi:10.1109/TASC.2011.2178978http://cds.cern.ch/record/1425492engLackner, FBertinelli, FFessia, PLopez, RPrin, HTock, J PhDevelopment of a New Insulation Approach for the LHC Main 13 kA Interconnection SplicesAccelerators and Storage RingsIn the long LHC (Large Hadron Collider) shutdown in 2013 it is foreseen to intervene on all the 13 kA interconnections in order to guarantee the necessary margin and redundancy to provide safe LHC operation at 7 TeV per beam. This implies reinforcement of the present interconnection configuration including a new insulation scheme of the busbars. The purpose of the new insulation model is to provide dielectric insulation with at least the same performance as its predecessor currently installed in the LHC machine, but in addition to contain the Lorentz forces. This paper describes the analytic and empirical approach of development to reach a new insulation concept based on state of the art materials and manufacturing techniques.CERN-ATS-2012-041oai:cds.cern.ch:14254922012-02-20
spellingShingle Accelerators and Storage Rings
Lackner, F
Bertinelli, F
Fessia, P
Lopez, R
Prin, H
Tock, J Ph
Development of a New Insulation Approach for the LHC Main 13 kA Interconnection Splices
title Development of a New Insulation Approach for the LHC Main 13 kA Interconnection Splices
title_full Development of a New Insulation Approach for the LHC Main 13 kA Interconnection Splices
title_fullStr Development of a New Insulation Approach for the LHC Main 13 kA Interconnection Splices
title_full_unstemmed Development of a New Insulation Approach for the LHC Main 13 kA Interconnection Splices
title_short Development of a New Insulation Approach for the LHC Main 13 kA Interconnection Splices
title_sort development of a new insulation approach for the lhc main 13 ka interconnection splices
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1109/TASC.2011.2178978
http://cds.cern.ch/record/1425492
work_keys_str_mv AT lacknerf developmentofanewinsulationapproachforthelhcmain13kainterconnectionsplices
AT bertinellif developmentofanewinsulationapproachforthelhcmain13kainterconnectionsplices
AT fessiap developmentofanewinsulationapproachforthelhcmain13kainterconnectionsplices
AT lopezr developmentofanewinsulationapproachforthelhcmain13kainterconnectionsplices
AT prinh developmentofanewinsulationapproachforthelhcmain13kainterconnectionsplices
AT tockjph developmentofanewinsulationapproachforthelhcmain13kainterconnectionsplices