Cargando…

Advanced Accelerator Magnets for Upgrading the LHC

The Large Hadron Collider is working at about half its design value, limited by the defective splices of the magnet interconnections. While the full energy will be attained after the splice consolidation in 2014, CERN is preparing a plan for a Luminosity upgrade (High Luminosity LHC) around 2020 and...

Descripción completa

Detalles Bibliográficos
Autores principales: Rossi, L, Bottura, K, de Rijk, G, Todesco, E
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2012.2186109
http://cds.cern.ch/record/1425893
_version_ 1780924239344304128
author Rossi, L
Bottura, K
de Rijk, G
Todesco, E
author_facet Rossi, L
Bottura, K
de Rijk, G
Todesco, E
author_sort Rossi, L
collection CERN
description The Large Hadron Collider is working at about half its design value, limited by the defective splices of the magnet interconnections. While the full energy will be attained after the splice consolidation in 2014, CERN is preparing a plan for a Luminosity upgrade (High Luminosity LHC) around 2020 and has launched a pre-study for exploring an Energy upgrade (High Energy LHC) around 2030. Both upgrades strongly rely on advanced accelerator magnet technology, requiring dipoles and quadrupoles of accelerator quality and operating fields in the 11-13 T range for the luminosity upgrade and 16-20 T range for the energy upgrade. The paper will review the last ten year of Nb$_{3}$Sn accelerator magnet R&D and compare it to the needs of the upgrades and will critically assess the results of the Nb$_{3}$Sn and HTS technology and the planned R&D programs also based on the inputs of first year of LHC operation.
id cern-1425893
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14258932019-09-30T06:29:59Zdoi:10.1109/TASC.2012.2186109http://cds.cern.ch/record/1425893engRossi, LBottura, Kde Rijk, GTodesco, EAdvanced Accelerator Magnets for Upgrading the LHCAccelerators and Storage RingsThe Large Hadron Collider is working at about half its design value, limited by the defective splices of the magnet interconnections. While the full energy will be attained after the splice consolidation in 2014, CERN is preparing a plan for a Luminosity upgrade (High Luminosity LHC) around 2020 and has launched a pre-study for exploring an Energy upgrade (High Energy LHC) around 2030. Both upgrades strongly rely on advanced accelerator magnet technology, requiring dipoles and quadrupoles of accelerator quality and operating fields in the 11-13 T range for the luminosity upgrade and 16-20 T range for the energy upgrade. The paper will review the last ten year of Nb$_{3}$Sn accelerator magnet R&D and compare it to the needs of the upgrades and will critically assess the results of the Nb$_{3}$Sn and HTS technology and the planned R&D programs also based on the inputs of first year of LHC operation.CERN-ATS-2012-045oai:cds.cern.ch:14258932012-02-20
spellingShingle Accelerators and Storage Rings
Rossi, L
Bottura, K
de Rijk, G
Todesco, E
Advanced Accelerator Magnets for Upgrading the LHC
title Advanced Accelerator Magnets for Upgrading the LHC
title_full Advanced Accelerator Magnets for Upgrading the LHC
title_fullStr Advanced Accelerator Magnets for Upgrading the LHC
title_full_unstemmed Advanced Accelerator Magnets for Upgrading the LHC
title_short Advanced Accelerator Magnets for Upgrading the LHC
title_sort advanced accelerator magnets for upgrading the lhc
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1109/TASC.2012.2186109
http://cds.cern.ch/record/1425893
work_keys_str_mv AT rossil advancedacceleratormagnetsforupgradingthelhc
AT botturak advancedacceleratormagnetsforupgradingthelhc
AT derijkg advancedacceleratormagnetsforupgradingthelhc
AT todescoe advancedacceleratormagnetsforupgradingthelhc