Cargando…

Design and Development of Separation Septa for the CERN PS Booster Upgrade

The CERN PS Booster project foresees the injection of 160 MeV H- ions into the booster from Linac 4. For this substantial upgrade, a system of 5 pulsed magnets (BIDIS) and 3 vertical septa (BISMV) will distribute the Linac pulses into the four-vertically separated Booster injection lines before bein...

Descripción completa

Detalles Bibliográficos
Autores principales: Hourican, M, Balhan, B, Borburgh, J, Masson, T
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2012.2187511
http://cds.cern.ch/record/1425901