Cargando…
Cost estimate for the High Power SPL (HP-SPL)
This note gives a cost estimate for the construction of a 5GeV, 4MW High Power H− Linac (SPL) on the CERN site.
Autor principal: | Gerigk, F |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1431871 |
Ejemplares similares
-
The low-power SPL
por: Gerigk, F
Publicado: (2008) -
Status of the SPL at CERN
por: Garoby, R, et al.
Publicado: (2007) -
Formulae to Calculate the Power Consumption of the SPL SC Cavities
por: Gerigk, F
Publicado: (2006) -
Status of the SPL
por: Brunner, O, et al.
Publicado: (2009) -
SPL design optimization
por: Meng, C, et al.
Publicado: (2013)