Cargando…

Beam-Based Collimator Alignment MD

The MD was performed on 21st April 2012, and was split into two parts. First, the alignment of a horizontal IR3 collimator was performed at different Dp/p cuts of the IR3 TCP to observe any improvements in the BLM spike quality. Secondly, new additions to the beam-based collimator alignment software...

Descripción completa

Detalles Bibliográficos
Autores principales: Assmann, R, Bruce, R, Muller, GJ, Redaelli, S, Salvachua, B, Valentino, G
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1450202
_version_ 1780924911872638976
author Assmann, R
Bruce, R
Muller, GJ
Redaelli, S
Salvachua, B
Valentino, G
author_facet Assmann, R
Bruce, R
Muller, GJ
Redaelli, S
Salvachua, B
Valentino, G
author_sort Assmann, R
collection CERN
description The MD was performed on 21st April 2012, and was split into two parts. First, the alignment of a horizontal IR3 collimator was performed at different Dp/p cuts of the IR3 TCP to observe any improvements in the BLM spike quality. Secondly, new additions to the beam-based collimator alignment software aimed at speeding up the alignment were tested. The new features include coarse alignment of the collimator jaws around the BPM-interpolated orbit and new sequences in the parallel alignment algorithm to ensure that both jaws touch the beam before fine sequential alignment can proceed. The new software allowed 27 collimators to be aligned in 1 hour 45 minutes, which translates to a total of 5.5 hours for all collimators, an improvement of 2 hours over the previous best time achieved in the March 2012 setups.
id cern-1450202
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14502022019-09-30T06:29:59Zhttp://cds.cern.ch/record/1450202engAssmann, RBruce, RMuller, GJRedaelli, SSalvachua, BValentino, GBeam-Based Collimator Alignment MDAccelerators and Storage RingsThe MD was performed on 21st April 2012, and was split into two parts. First, the alignment of a horizontal IR3 collimator was performed at different Dp/p cuts of the IR3 TCP to observe any improvements in the BLM spike quality. Secondly, new additions to the beam-based collimator alignment software aimed at speeding up the alignment were tested. The new features include coarse alignment of the collimator jaws around the BPM-interpolated orbit and new sequences in the parallel alignment algorithm to ensure that both jaws touch the beam before fine sequential alignment can proceed. The new software allowed 27 collimators to be aligned in 1 hour 45 minutes, which translates to a total of 5.5 hours for all collimators, an improvement of 2 hours over the previous best time achieved in the March 2012 setups.CERN-ATS-Note-2012-046 MDoai:cds.cern.ch:14502022012-05-22
spellingShingle Accelerators and Storage Rings
Assmann, R
Bruce, R
Muller, GJ
Redaelli, S
Salvachua, B
Valentino, G
Beam-Based Collimator Alignment MD
title Beam-Based Collimator Alignment MD
title_full Beam-Based Collimator Alignment MD
title_fullStr Beam-Based Collimator Alignment MD
title_full_unstemmed Beam-Based Collimator Alignment MD
title_short Beam-Based Collimator Alignment MD
title_sort beam-based collimator alignment md
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1450202
work_keys_str_mv AT assmannr beambasedcollimatoralignmentmd
AT brucer beambasedcollimatoralignmentmd
AT mullergj beambasedcollimatoralignmentmd
AT redaellis beambasedcollimatoralignmentmd
AT salvachuab beambasedcollimatoralignmentmd
AT valentinog beambasedcollimatoralignmentmd