Studies on the LHC superconducting circuits and routine qualification of their functionalities
The Large Hadron Collider (LHC) is systematically undergoing periods of maintenance stop (either 4-5 days stops or longer Christmas breaks), after which some or all superconducting circuits have to be re-commissioned to check the correct functionality of all powering and protection systems. Detailed...
Autores principales: | Pojer, M, D’Angelo, G, Mompo, R, Schmidt, R, Solfaroli Camillocci, M |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1459484 |
Ejemplares similares
-
Re-commissioning of the Superconducting Circuits
por: Solfaroli Camillocci, M, et al.
Publicado: (2015) -
Optimization of the powering tests of the LHC superconducting circuits
por: Bellesia, B, et al.
Publicado: (2009) -
Performance of the Superconducting Corrector Magnet Circuits during the Commissioning of the LHC
por: Venturini-Delsolaro, W, et al.
Publicado: (2008) -
Magnet Circuits
por: Vergara Fernandez, A, et al.
Publicado: (2009) -
Automatic System for the D.C. High Voltage Qualification of the Superconducting Electrical Circuits of the LHC Machine
por: Bozzini, D, et al.
Publicado: (2008)