Cargando…
Vacuum chamber to tracker interfaces with respect to beam position and bakeout
Autor principal: | Gallilee, Mark Antony |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1459643 |
Ejemplares similares
-
The cooling and bakeout system of the LEP main ring vacuum chambers
por: Schuhbäck, H
Publicado: (1990) -
ALICE's first vacuum bakeout a success
Publicado: (2007) -
A bakeout system for vacuum equipment of the SPS machine
por: Koelemeijer, W
Publicado: (1981) -
VA BEAM PIPE COOLING FOR BAKEOUT CONDITIONS
por: Elias, N, et al.
Publicado: (2003) -
The installation and bakeout shell of ALICE's central beryllium beam pipe and absorber beam pipe, running through the middle of the Inner Tracker System (ITS) and Time Projection Chamber (TPC)
Publicado: (2007)