Cargando…
Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3
The Test Beam Line in the CLIC Test Facility 3 is the first prototype of the CLIC drive beam decelerator. The main purpose of the experiment is to demonstrate efficient 12 GHz rf power production and stable transport of an electron drive beam during deceleration. The Test Beam Line consists of a FOD...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1459814 |
_version_ | 1780925205218066432 |
---|---|
author | Lillestøl, R L Dӧbert, S Olvegård, M Rabiller, A N Sterbini, G Adli, E |
author_facet | Lillestøl, R L Dӧbert, S Olvegård, M Rabiller, A N Sterbini, G Adli, E |
author_sort | Lillestøl, R L |
collection | CERN |
description | The Test Beam Line in the CLIC Test Facility 3 is the first prototype of the CLIC drive beam decelerator. The main purpose of the experiment is to demonstrate efficient 12 GHz rf power production and stable transport of an electron drive beam during deceleration. The Test Beam Line consists of a FODO structure with high precision BPMs and quadrupoles mounted on mechanical movers for precisebeam alignment. Nine out of the planned 16 Power Extraction and Transfer Structures have currently been installed and commissioned. We correlate rf power production measurements with the drive beam deceleration measurements, and compare the two measurements to the theoretical predictions. We also discuss the impact of the drive beam bunch length and bunch combination on the measurements. |
id | cern-1459814 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
record_format | invenio |
spelling | cern-14598142023-07-20T15:06:24Zhttp://cds.cern.ch/record/1459814engLillestøl, R LDӧbert, SOlvegård, MRabiller, A NSterbini, GAdli, EExperimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3Accelerators and Storage RingsThe Test Beam Line in the CLIC Test Facility 3 is the first prototype of the CLIC drive beam decelerator. The main purpose of the experiment is to demonstrate efficient 12 GHz rf power production and stable transport of an electron drive beam during deceleration. The Test Beam Line consists of a FODO structure with high precision BPMs and quadrupoles mounted on mechanical movers for precisebeam alignment. Nine out of the planned 16 Power Extraction and Transfer Structures have currently been installed and commissioned. We correlate rf power production measurements with the drive beam deceleration measurements, and compare the two measurements to the theoretical predictions. We also discuss the impact of the drive beam bunch length and bunch combination on the measurements.CERN-ATS-2012-124CLIC-Note-974oai:cds.cern.ch:14598142012-05-20 |
spellingShingle | Accelerators and Storage Rings Lillestøl, R L Dӧbert, S Olvegård, M Rabiller, A N Sterbini, G Adli, E Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3 |
title | Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3 |
title_full | Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3 |
title_fullStr | Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3 |
title_full_unstemmed | Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3 |
title_short | Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3 |
title_sort | experimental verification of the clic decelerator with the test beam line in the clic test facility 3 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1459814 |
work_keys_str_mv | AT lillestølrl experimentalverificationoftheclicdeceleratorwiththetestbeamlineintheclictestfacility3 AT döberts experimentalverificationoftheclicdeceleratorwiththetestbeamlineintheclictestfacility3 AT olvegardm experimentalverificationoftheclicdeceleratorwiththetestbeamlineintheclictestfacility3 AT rabilleran experimentalverificationoftheclicdeceleratorwiththetestbeamlineintheclictestfacility3 AT sterbinig experimentalverificationoftheclicdeceleratorwiththetestbeamlineintheclictestfacility3 AT adlie experimentalverificationoftheclicdeceleratorwiththetestbeamlineintheclictestfacility3 |