Cargando…

Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3

The Test Beam Line in the CLIC Test Facility 3 is the first prototype of the CLIC drive beam decelerator. The main purpose of the experiment is to demonstrate efficient 12 GHz rf power production and stable transport of an electron drive beam during deceleration. The Test Beam Line consists of a FOD...

Descripción completa

Detalles Bibliográficos
Autores principales: Lillestøl, R L, Dӧbert, S, Olvegård, M, Rabiller, A N, Sterbini, G, Adli, E
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1459814
_version_ 1780925205218066432
author Lillestøl, R L
Dӧbert, S
Olvegård, M
Rabiller, A N
Sterbini, G
Adli, E
author_facet Lillestøl, R L
Dӧbert, S
Olvegård, M
Rabiller, A N
Sterbini, G
Adli, E
author_sort Lillestøl, R L
collection CERN
description The Test Beam Line in the CLIC Test Facility 3 is the first prototype of the CLIC drive beam decelerator. The main purpose of the experiment is to demonstrate efficient 12 GHz rf power production and stable transport of an electron drive beam during deceleration. The Test Beam Line consists of a FODO structure with high precision BPMs and quadrupoles mounted on mechanical movers for precisebeam alignment. Nine out of the planned 16 Power Extraction and Transfer Structures have currently been installed and commissioned. We correlate rf power production measurements with the drive beam deceleration measurements, and compare the two measurements to the theoretical predictions. We also discuss the impact of the drive beam bunch length and bunch combination on the measurements.
id cern-1459814
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14598142023-07-20T15:06:24Zhttp://cds.cern.ch/record/1459814engLillestøl, R LDӧbert, SOlvegård, MRabiller, A NSterbini, GAdli, EExperimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3Accelerators and Storage RingsThe Test Beam Line in the CLIC Test Facility 3 is the first prototype of the CLIC drive beam decelerator. The main purpose of the experiment is to demonstrate efficient 12 GHz rf power production and stable transport of an electron drive beam during deceleration. The Test Beam Line consists of a FODO structure with high precision BPMs and quadrupoles mounted on mechanical movers for precisebeam alignment. Nine out of the planned 16 Power Extraction and Transfer Structures have currently been installed and commissioned. We correlate rf power production measurements with the drive beam deceleration measurements, and compare the two measurements to the theoretical predictions. We also discuss the impact of the drive beam bunch length and bunch combination on the measurements.CERN-ATS-2012-124CLIC-Note-974oai:cds.cern.ch:14598142012-05-20
spellingShingle Accelerators and Storage Rings
Lillestøl, R L
Dӧbert, S
Olvegård, M
Rabiller, A N
Sterbini, G
Adli, E
Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3
title Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3
title_full Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3
title_fullStr Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3
title_full_unstemmed Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3
title_short Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3
title_sort experimental verification of the clic decelerator with the test beam line in the clic test facility 3
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1459814
work_keys_str_mv AT lillestølrl experimentalverificationoftheclicdeceleratorwiththetestbeamlineintheclictestfacility3
AT döberts experimentalverificationoftheclicdeceleratorwiththetestbeamlineintheclictestfacility3
AT olvegardm experimentalverificationoftheclicdeceleratorwiththetestbeamlineintheclictestfacility3
AT rabilleran experimentalverificationoftheclicdeceleratorwiththetestbeamlineintheclictestfacility3
AT sterbinig experimentalverificationoftheclicdeceleratorwiththetestbeamlineintheclictestfacility3
AT adlie experimentalverificationoftheclicdeceleratorwiththetestbeamlineintheclictestfacility3