Cargando…
Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3
The Test Beam Line in the CLIC Test Facility 3 is the first prototype of the CLIC drive beam decelerator. The main purpose of the experiment is to demonstrate efficient 12 GHz rf power production and stable transport of an electron drive beam during deceleration. The Test Beam Line consists of a FOD...
Autores principales: | Lillestøl, R L, Dӧbert, S, Olvegård, M, Rabiller, A N, Sterbini, G, Adli, E |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1459814 |
Ejemplares similares
-
Deceleration Measurements of an Electron Beam in the CLIC Test Facility 3
por: Lillestøl, Reidar, et al.
Publicado: (2014) -
Collective effects and experimental verification of the CLIC drive beam and decelerator
por: Lillestol, Reidar Lunde
Publicado: (2016) -
Experimental Results from the Test Beam Line in the CLIC Test Facility 3
por: Lillestol, R L, et al.
Publicado: (2013) -
Experimental Program for the CLIC test facility 3 test beam line
por: Adli, E, et al.
Publicado: (2010) -
Electron beam deceleration measurements using the decelerator test beam line in the Compact Linear Collider test facility
por: Lillestøl, R L, et al.
Publicado: (2014)