Cargando…
Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets
During the 2011 run of the LHC there was a significant measured temperature increase in the LHC Injection Kicker Magnets (MKI) during operation with 50ns bunch spacing. This was due to increased beam-induced heating of the magnet due to beam impedance. Due to concerns about future heating with the i...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1460133 |
_version_ | 1780925217251524608 |
---|---|
author | Day, H Barnes, MJ Caspersy, F Jones, RM Métral, E Salvanty, B |
author_facet | Day, H Barnes, MJ Caspersy, F Jones, RM Métral, E Salvanty, B |
author_sort | Day, H |
collection | CERN |
description | During the 2011 run of the LHC there was a significant measured temperature increase in the LHC Injection Kicker Magnets (MKI) during operation with 50ns bunch spacing. This was due to increased beam-induced heating of the magnet due to beam impedance. Due to concerns about future heating with the increased total intensity to nominal and ultimate luminosities a review of the impedance reduction techniques within the magnet was required. A number of new beam screen designs are proposed and their impedance evaluated. Heating estimates are also given with a particular attention paid to future intensity upgrades to ultimate parameters. |
id | cern-1460133 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
record_format | invenio |
spelling | cern-14601332022-08-17T13:26:48Zhttp://cds.cern.ch/record/1460133engDay, HBarnes, MJCaspersy, FJones, RMMétral, ESalvanty, BEvaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker MagnetsAccelerators and Storage RingsDuring the 2011 run of the LHC there was a significant measured temperature increase in the LHC Injection Kicker Magnets (MKI) during operation with 50ns bunch spacing. This was due to increased beam-induced heating of the magnet due to beam impedance. Due to concerns about future heating with the increased total intensity to nominal and ultimate luminosities a review of the impedance reduction techniques within the magnet was required. A number of new beam screen designs are proposed and their impedance evaluated. Heating estimates are also given with a particular attention paid to future intensity upgrades to ultimate parameters.CERN-ATS-2012-142oai:cds.cern.ch:14601332012-05-20 |
spellingShingle | Accelerators and Storage Rings Day, H Barnes, MJ Caspersy, F Jones, RM Métral, E Salvanty, B Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets |
title | Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets |
title_full | Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets |
title_fullStr | Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets |
title_full_unstemmed | Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets |
title_short | Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets |
title_sort | evaluation of the beam coupling impedance of new beam screen designs for the lhc injection kicker magnets |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1460133 |
work_keys_str_mv | AT dayh evaluationofthebeamcouplingimpedanceofnewbeamscreendesignsforthelhcinjectionkickermagnets AT barnesmj evaluationofthebeamcouplingimpedanceofnewbeamscreendesignsforthelhcinjectionkickermagnets AT caspersyf evaluationofthebeamcouplingimpedanceofnewbeamscreendesignsforthelhcinjectionkickermagnets AT jonesrm evaluationofthebeamcouplingimpedanceofnewbeamscreendesignsforthelhcinjectionkickermagnets AT metrale evaluationofthebeamcouplingimpedanceofnewbeamscreendesignsforthelhcinjectionkickermagnets AT salvantyb evaluationofthebeamcouplingimpedanceofnewbeamscreendesignsforthelhcinjectionkickermagnets |