Cargando…

Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets

During the 2011 run of the LHC there was a significant measured temperature increase in the LHC Injection Kicker Magnets (MKI) during operation with 50ns bunch spacing. This was due to increased beam-induced heating of the magnet due to beam impedance. Due to concerns about future heating with the i...

Descripción completa

Detalles Bibliográficos
Autores principales: Day, H, Barnes, MJ, Caspersy, F, Jones, RM, Métral, E, Salvanty, B
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1460133
_version_ 1780925217251524608
author Day, H
Barnes, MJ
Caspersy, F
Jones, RM
Métral, E
Salvanty, B
author_facet Day, H
Barnes, MJ
Caspersy, F
Jones, RM
Métral, E
Salvanty, B
author_sort Day, H
collection CERN
description During the 2011 run of the LHC there was a significant measured temperature increase in the LHC Injection Kicker Magnets (MKI) during operation with 50ns bunch spacing. This was due to increased beam-induced heating of the magnet due to beam impedance. Due to concerns about future heating with the increased total intensity to nominal and ultimate luminosities a review of the impedance reduction techniques within the magnet was required. A number of new beam screen designs are proposed and their impedance evaluated. Heating estimates are also given with a particular attention paid to future intensity upgrades to ultimate parameters.
id cern-1460133
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14601332022-08-17T13:26:48Zhttp://cds.cern.ch/record/1460133engDay, HBarnes, MJCaspersy, FJones, RMMétral, ESalvanty, BEvaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker MagnetsAccelerators and Storage RingsDuring the 2011 run of the LHC there was a significant measured temperature increase in the LHC Injection Kicker Magnets (MKI) during operation with 50ns bunch spacing. This was due to increased beam-induced heating of the magnet due to beam impedance. Due to concerns about future heating with the increased total intensity to nominal and ultimate luminosities a review of the impedance reduction techniques within the magnet was required. A number of new beam screen designs are proposed and their impedance evaluated. Heating estimates are also given with a particular attention paid to future intensity upgrades to ultimate parameters.CERN-ATS-2012-142oai:cds.cern.ch:14601332012-05-20
spellingShingle Accelerators and Storage Rings
Day, H
Barnes, MJ
Caspersy, F
Jones, RM
Métral, E
Salvanty, B
Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets
title Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets
title_full Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets
title_fullStr Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets
title_full_unstemmed Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets
title_short Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets
title_sort evaluation of the beam coupling impedance of new beam screen designs for the lhc injection kicker magnets
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1460133
work_keys_str_mv AT dayh evaluationofthebeamcouplingimpedanceofnewbeamscreendesignsforthelhcinjectionkickermagnets
AT barnesmj evaluationofthebeamcouplingimpedanceofnewbeamscreendesignsforthelhcinjectionkickermagnets
AT caspersyf evaluationofthebeamcouplingimpedanceofnewbeamscreendesignsforthelhcinjectionkickermagnets
AT jonesrm evaluationofthebeamcouplingimpedanceofnewbeamscreendesignsforthelhcinjectionkickermagnets
AT metrale evaluationofthebeamcouplingimpedanceofnewbeamscreendesignsforthelhcinjectionkickermagnets
AT salvantyb evaluationofthebeamcouplingimpedanceofnewbeamscreendesignsforthelhcinjectionkickermagnets