Cargando…
Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets
During the 2011 run of the LHC there was a significant measured temperature increase in the LHC Injection Kicker Magnets (MKI) during operation with 50ns bunch spacing. This was due to increased beam-induced heating of the magnet due to beam impedance. Due to concerns about future heating with the i...
Autores principales: | Day, H, Barnes, MJ, Caspersy, F, Jones, RM, Métral, E, Salvanty, B |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1460133 |
Ejemplares similares
-
Beam Coupling Impedance of the New Beam Screen of the LHC Injection Kicker Magnets
por: Day, H, et al.
Publicado: (2014) -
Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets
por: Day, Hugo, et al.
Publicado: (2012) -
Beam Coupling Impedance of the New Beam Screen of the LHC Injection Kicker Magnets
por: Day, Hugo, et al.
Publicado: (2014) -
Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets
por: Day, H, et al.
Publicado: (2013) -
The Beam Screen for the LHC Injection Kicker Magnets
por: Barnes, MJ, et al.
Publicado: (2006)