Cargando…
Optimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron Gun
Recent developments in the DC gun technology used at CEBAF have allowed an increase in operational voltage from 100kV to 130kV. In the near future this will be extended further to 200kV with the purchase of a new power supply. The injector components and layout at this time have been designed specif...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1462789 |
_version_ | 1780925317710348288 |
---|---|
author | Hannon, F E Hofler, A S Kazimi, R |
author_facet | Hannon, F E Hofler, A S Kazimi, R |
author_sort | Hannon, F E |
collection | CERN |
description | Recent developments in the DC gun technology used at CEBAF have allowed an increase in operational voltage from 100kV to 130kV. In the near future this will be extended further to 200kV with the purchase of a new power supply. The injector components and layout at this time have been designed specifically for 100kV operation. It is anticipated that with an increase in gun voltage and optimization of the layout and components for 200kV operation, that the electron bunch length and beam brightness can be improved upon. This paper explores some upgrade possibilities for a 200kV gun CEBAF injector through beam dynamic simulations. |
id | cern-1462789 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-14627892022-08-17T13:30:46Zhttp://cds.cern.ch/record/1462789engHannon, F EHofler, A SKazimi, ROptimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron GunAccelerators and Storage RingsRecent developments in the DC gun technology used at CEBAF have allowed an increase in operational voltage from 100kV to 130kV. In the near future this will be extended further to 200kV with the purchase of a new power supply. The injector components and layout at this time have been designed specifically for 100kV operation. It is anticipated that with an increase in gun voltage and optimization of the layout and components for 200kV operation, that the electron bunch length and beam brightness can be improved upon. This paper explores some upgrade possibilities for a 200kV gun CEBAF injector through beam dynamic simulations.oai:cds.cern.ch:14627892011 |
spellingShingle | Accelerators and Storage Rings Hannon, F E Hofler, A S Kazimi, R Optimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron Gun |
title | Optimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron Gun |
title_full | Optimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron Gun |
title_fullStr | Optimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron Gun |
title_full_unstemmed | Optimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron Gun |
title_short | Optimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron Gun |
title_sort | optimizing the cebaf injector for beam operation with a higher voltage electron gun |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1462789 |
work_keys_str_mv | AT hannonfe optimizingthecebafinjectorforbeamoperationwithahighervoltageelectrongun AT hofleras optimizingthecebafinjectorforbeamoperationwithahighervoltageelectrongun AT kazimir optimizingthecebafinjectorforbeamoperationwithahighervoltageelectrongun |