Cargando…
Measurements and simulations of transverse coupled-bunch instability rise times in the LHC
In the current configuration of the LHC, multibunch instabilities due to the beam-coupling impedance would be in principle a critical limitation if they were not damped by the transverse feedback. For the future operation of the machine, in particular at higher bunch intensities and/or higher number...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1464098 |
_version_ | 1780925350663946240 |
---|---|
author | Mounet, N Metral, E Rumolo, G Kain, V Valuch, D Alemany-Fernandez, R Hofle, W Jacquet, D Ponce, L Redaelli, S Suykerbuyk, R |
author_facet | Mounet, N Metral, E Rumolo, G Kain, V Valuch, D Alemany-Fernandez, R Hofle, W Jacquet, D Ponce, L Redaelli, S Suykerbuyk, R |
author_sort | Mounet, N |
collection | CERN |
description | In the current configuration of the LHC, multibunch instabilities due to the beam-coupling impedance would be in principle a critical limitation if they were not damped by the transverse feedback. For the future operation of the machine, in particular at higher bunch intensities and/or higher number of bunches, one needs to make sure the coupled-bunch instability rise times are still manageable by the feedback system. Therefore, in May 2011 experiments were performed to measure those rise times and compare them with the results obtained from the LHC impedance model and the HEADTAIL wake fields simulation code. At injection energy, agreement turns out to be very good, while a larger discrepancy appears at top energy. |
id | cern-1464098 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
record_format | invenio |
spelling | cern-14640982022-08-17T13:31:45Zhttp://cds.cern.ch/record/1464098engMounet, NMetral, ERumolo, GKain, VValuch, DAlemany-Fernandez, RHofle, WJacquet, DPonce, LRedaelli, SSuykerbuyk, RMeasurements and simulations of transverse coupled-bunch instability rise times in the LHCAccelerators and Storage RingsIn the current configuration of the LHC, multibunch instabilities due to the beam-coupling impedance would be in principle a critical limitation if they were not damped by the transverse feedback. For the future operation of the machine, in particular at higher bunch intensities and/or higher number of bunches, one needs to make sure the coupled-bunch instability rise times are still manageable by the feedback system. Therefore, in May 2011 experiments were performed to measure those rise times and compare them with the results obtained from the LHC impedance model and the HEADTAIL wake fields simulation code. At injection energy, agreement turns out to be very good, while a larger discrepancy appears at top energy.CERN-ATS-2012-179oai:cds.cern.ch:14640982012-05-20 |
spellingShingle | Accelerators and Storage Rings Mounet, N Metral, E Rumolo, G Kain, V Valuch, D Alemany-Fernandez, R Hofle, W Jacquet, D Ponce, L Redaelli, S Suykerbuyk, R Measurements and simulations of transverse coupled-bunch instability rise times in the LHC |
title | Measurements and simulations of transverse coupled-bunch instability rise times in the LHC |
title_full | Measurements and simulations of transverse coupled-bunch instability rise times in the LHC |
title_fullStr | Measurements and simulations of transverse coupled-bunch instability rise times in the LHC |
title_full_unstemmed | Measurements and simulations of transverse coupled-bunch instability rise times in the LHC |
title_short | Measurements and simulations of transverse coupled-bunch instability rise times in the LHC |
title_sort | measurements and simulations of transverse coupled-bunch instability rise times in the lhc |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1464098 |
work_keys_str_mv | AT mounetn measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc AT metrale measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc AT rumolog measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc AT kainv measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc AT valuchd measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc AT alemanyfernandezr measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc AT hoflew measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc AT jacquetd measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc AT poncel measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc AT redaellis measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc AT suykerbuykr measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc |