Cargando…

Measurements and simulations of transverse coupled-bunch instability rise times in the LHC

In the current configuration of the LHC, multibunch instabilities due to the beam-coupling impedance would be in principle a critical limitation if they were not damped by the transverse feedback. For the future operation of the machine, in particular at higher bunch intensities and/or higher number...

Descripción completa

Detalles Bibliográficos
Autores principales: Mounet, N, Metral, E, Rumolo, G, Kain, V, Valuch, D, Alemany-Fernandez, R, Hofle, W, Jacquet, D, Ponce, L, Redaelli, S, Suykerbuyk, R
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1464098
_version_ 1780925350663946240
author Mounet, N
Metral, E
Rumolo, G
Kain, V
Valuch, D
Alemany-Fernandez, R
Hofle, W
Jacquet, D
Ponce, L
Redaelli, S
Suykerbuyk, R
author_facet Mounet, N
Metral, E
Rumolo, G
Kain, V
Valuch, D
Alemany-Fernandez, R
Hofle, W
Jacquet, D
Ponce, L
Redaelli, S
Suykerbuyk, R
author_sort Mounet, N
collection CERN
description In the current configuration of the LHC, multibunch instabilities due to the beam-coupling impedance would be in principle a critical limitation if they were not damped by the transverse feedback. For the future operation of the machine, in particular at higher bunch intensities and/or higher number of bunches, one needs to make sure the coupled-bunch instability rise times are still manageable by the feedback system. Therefore, in May 2011 experiments were performed to measure those rise times and compare them with the results obtained from the LHC impedance model and the HEADTAIL wake fields simulation code. At injection energy, agreement turns out to be very good, while a larger discrepancy appears at top energy.
id cern-1464098
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14640982022-08-17T13:31:45Zhttp://cds.cern.ch/record/1464098engMounet, NMetral, ERumolo, GKain, VValuch, DAlemany-Fernandez, RHofle, WJacquet, DPonce, LRedaelli, SSuykerbuyk, RMeasurements and simulations of transverse coupled-bunch instability rise times in the LHCAccelerators and Storage RingsIn the current configuration of the LHC, multibunch instabilities due to the beam-coupling impedance would be in principle a critical limitation if they were not damped by the transverse feedback. For the future operation of the machine, in particular at higher bunch intensities and/or higher number of bunches, one needs to make sure the coupled-bunch instability rise times are still manageable by the feedback system. Therefore, in May 2011 experiments were performed to measure those rise times and compare them with the results obtained from the LHC impedance model and the HEADTAIL wake fields simulation code. At injection energy, agreement turns out to be very good, while a larger discrepancy appears at top energy.CERN-ATS-2012-179oai:cds.cern.ch:14640982012-05-20
spellingShingle Accelerators and Storage Rings
Mounet, N
Metral, E
Rumolo, G
Kain, V
Valuch, D
Alemany-Fernandez, R
Hofle, W
Jacquet, D
Ponce, L
Redaelli, S
Suykerbuyk, R
Measurements and simulations of transverse coupled-bunch instability rise times in the LHC
title Measurements and simulations of transverse coupled-bunch instability rise times in the LHC
title_full Measurements and simulations of transverse coupled-bunch instability rise times in the LHC
title_fullStr Measurements and simulations of transverse coupled-bunch instability rise times in the LHC
title_full_unstemmed Measurements and simulations of transverse coupled-bunch instability rise times in the LHC
title_short Measurements and simulations of transverse coupled-bunch instability rise times in the LHC
title_sort measurements and simulations of transverse coupled-bunch instability rise times in the lhc
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1464098
work_keys_str_mv AT mounetn measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc
AT metrale measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc
AT rumolog measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc
AT kainv measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc
AT valuchd measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc
AT alemanyfernandezr measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc
AT hoflew measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc
AT jacquetd measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc
AT poncel measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc
AT redaellis measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc
AT suykerbuykr measurementsandsimulationsoftransversecoupledbunchinstabilityrisetimesinthelhc