Experimental verification of the CLIC two-beam scheme, status and outlook

The feasibility of the CLIC novel scheme of two-beam acceleration was extensively tested in the CTF3 facility over the last few years. In particular, efficient full beam loading acceleration, isochronous ring operation, beam recombination by transverse RF deflectors have been fully proven. 12 GHz RF...

Descripción completa

Detalles Bibliográficos
Autor principal: Corsini, R
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1464099
_version_ 1780925350872612864
author Corsini, R
author_facet Corsini, R
author_sort Corsini, R
collection CERN
description The feasibility of the CLIC novel scheme of two-beam acceleration was extensively tested in the CTF3 facility over the last few years. In particular, efficient full beam loading acceleration, isochronous ring operation, beam recombination by transverse RF deflectors have been fully proven. 12 GHz RF power production by highcurrent drive beam is now part of CTF3 routine operation, and two-beam acceleration up to 150 MV/m has been achieved. Drive beam deceleration tests were carried out as well. In this paper we summarize the main results obtained, including the more recent ones. We also outline and discuss the future experimental program, both in CTF3 and in other beam facilities, as well as the path to a possible facility needed in the initial stage of the CLIC project, CLIC0.
id cern-1464099
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14640992023-07-20T15:02:08Zhttp://cds.cern.ch/record/1464099engCorsini, RExperimental verification of the CLIC two-beam scheme, status and outlookAccelerators and Storage RingsThe feasibility of the CLIC novel scheme of two-beam acceleration was extensively tested in the CTF3 facility over the last few years. In particular, efficient full beam loading acceleration, isochronous ring operation, beam recombination by transverse RF deflectors have been fully proven. 12 GHz RF power production by highcurrent drive beam is now part of CTF3 routine operation, and two-beam acceleration up to 150 MV/m has been achieved. Drive beam deceleration tests were carried out as well. In this paper we summarize the main results obtained, including the more recent ones. We also outline and discuss the future experimental program, both in CTF3 and in other beam facilities, as well as the path to a possible facility needed in the initial stage of the CLIC project, CLIC0.CERN-ATS-2012-180CLIC-Note-962oai:cds.cern.ch:14640992012-05-20
spellingShingle Accelerators and Storage Rings
Corsini, R
Experimental verification of the CLIC two-beam scheme, status and outlook
title Experimental verification of the CLIC two-beam scheme, status and outlook
title_full Experimental verification of the CLIC two-beam scheme, status and outlook
title_fullStr Experimental verification of the CLIC two-beam scheme, status and outlook
title_full_unstemmed Experimental verification of the CLIC two-beam scheme, status and outlook
title_short Experimental verification of the CLIC two-beam scheme, status and outlook
title_sort experimental verification of the clic two-beam scheme, status and outlook
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1464099
work_keys_str_mv AT corsinir experimentalverificationoftheclictwobeamschemestatusandoutlook