Cargando…
Experimental verification of the CLIC two-beam scheme, status and outlook
The feasibility of the CLIC novel scheme of two-beam acceleration was extensively tested in the CTF3 facility over the last few years. In particular, efficient full beam loading acceleration, isochronous ring operation, beam recombination by transverse RF deflectors have been fully proven. 12 GHz RF...
Autor principal: | Corsini, R |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1464099 |
Ejemplares similares
-
The CLIC multi-drive beam scheme
por: Corsini, R, et al.
Publicado: (1998) -
The CLIC Multi-Drive Beam Scheme
por: Corsini, R, et al.
Publicado: (1998) -
CLIC Status and Outlook
por: Stapnes, Stapnes
Publicado: (2012) -
The collector ring scheme for CLIC drive beam generation
por: Corsini, R, et al.
Publicado: (1997) -
Experimental verification of the CLIC Decelerator with the test Beam Line in the CLIC test facility 3
por: Lillestøl, R L, et al.
Publicado: (2012)