Cargando…
Consolidation of the LHC Superconducting Circuits: A Major Step towards 14 TeV Collisions
Following the incident in one of the main dipole circuits of the Large Hadron Collider (LHC) in September 2008, a detailed analysis of all magnet circuits has been performed by a dedicated task force. This analysis has revealed critical issues in the design of the 13 kA splices between the supercond...
Autores principales: | , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1470329 |
_version_ | 1780925357366444032 |
---|---|
author | Tock, J Ph Bertinelli, F Bordry, F Fessia, P Ostojic, R Perin, A Prin, H Savary, F Scheuerlein, C Ten Kate, H H J Verweij, A Willering, G P |
author_facet | Tock, J Ph Bertinelli, F Bordry, F Fessia, P Ostojic, R Perin, A Prin, H Savary, F Scheuerlein, C Ten Kate, H H J Verweij, A Willering, G P |
author_sort | Tock, J Ph |
collection | CERN |
description | Following the incident in one of the main dipole circuits of the Large Hadron Collider (LHC) in September 2008, a detailed analysis of all magnet circuits has been performed by a dedicated task force. This analysis has revealed critical issues in the design of the 13 kA splices between the superconducting dipole and quadrupole magnets. These splices have to be consolidated before increasing the beam energy above 4 TeV and operating the LHC at 6.5-7 TeV per beam. The design of the consolidated 13 kA splices is complete and has been reviewed by an international committee of experts. Also, all other types of superconducting circuits have been thoroughly screened for potential safety issues and several important recommendations were established. They were critically assessed and the resulting actions are presented. In addition to the work on the 13 kA splices, other interventions will be performed during the first long shut-down of the LHC to consolidate globally all superconducting circuits. The associated quality control has been defined. Schedule constraints, repair production rate, available space and resources are presented as well. |
id | cern-1470329 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
record_format | invenio |
spelling | cern-14703292022-08-17T13:30:20Zhttp://cds.cern.ch/record/1470329engTock, J PhBertinelli, FBordry, FFessia, POstojic, RPerin, APrin, HSavary, FScheuerlein, CTen Kate, H H JVerweij, AWillering, G PConsolidation of the LHC Superconducting Circuits: A Major Step towards 14 TeV CollisionsAccelerators and Storage RingsFollowing the incident in one of the main dipole circuits of the Large Hadron Collider (LHC) in September 2008, a detailed analysis of all magnet circuits has been performed by a dedicated task force. This analysis has revealed critical issues in the design of the 13 kA splices between the superconducting dipole and quadrupole magnets. These splices have to be consolidated before increasing the beam energy above 4 TeV and operating the LHC at 6.5-7 TeV per beam. The design of the consolidated 13 kA splices is complete and has been reviewed by an international committee of experts. Also, all other types of superconducting circuits have been thoroughly screened for potential safety issues and several important recommendations were established. They were critically assessed and the resulting actions are presented. In addition to the work on the 13 kA splices, other interventions will be performed during the first long shut-down of the LHC to consolidate globally all superconducting circuits. The associated quality control has been defined. Schedule constraints, repair production rate, available space and resources are presented as well.CERN-ATS-2012-197oai:cds.cern.ch:14703292012-08-01 |
spellingShingle | Accelerators and Storage Rings Tock, J Ph Bertinelli, F Bordry, F Fessia, P Ostojic, R Perin, A Prin, H Savary, F Scheuerlein, C Ten Kate, H H J Verweij, A Willering, G P Consolidation of the LHC Superconducting Circuits: A Major Step towards 14 TeV Collisions |
title | Consolidation of the LHC Superconducting Circuits: A Major Step towards 14 TeV Collisions |
title_full | Consolidation of the LHC Superconducting Circuits: A Major Step towards 14 TeV Collisions |
title_fullStr | Consolidation of the LHC Superconducting Circuits: A Major Step towards 14 TeV Collisions |
title_full_unstemmed | Consolidation of the LHC Superconducting Circuits: A Major Step towards 14 TeV Collisions |
title_short | Consolidation of the LHC Superconducting Circuits: A Major Step towards 14 TeV Collisions |
title_sort | consolidation of the lhc superconducting circuits: a major step towards 14 tev collisions |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1470329 |
work_keys_str_mv | AT tockjph consolidationofthelhcsuperconductingcircuitsamajorsteptowards14tevcollisions AT bertinellif consolidationofthelhcsuperconductingcircuitsamajorsteptowards14tevcollisions AT bordryf consolidationofthelhcsuperconductingcircuitsamajorsteptowards14tevcollisions AT fessiap consolidationofthelhcsuperconductingcircuitsamajorsteptowards14tevcollisions AT ostojicr consolidationofthelhcsuperconductingcircuitsamajorsteptowards14tevcollisions AT perina consolidationofthelhcsuperconductingcircuitsamajorsteptowards14tevcollisions AT prinh consolidationofthelhcsuperconductingcircuitsamajorsteptowards14tevcollisions AT savaryf consolidationofthelhcsuperconductingcircuitsamajorsteptowards14tevcollisions AT scheuerleinc consolidationofthelhcsuperconductingcircuitsamajorsteptowards14tevcollisions AT tenkatehhj consolidationofthelhcsuperconductingcircuitsamajorsteptowards14tevcollisions AT verweija consolidationofthelhcsuperconductingcircuitsamajorsteptowards14tevcollisions AT willeringgp consolidationofthelhcsuperconductingcircuitsamajorsteptowards14tevcollisions |