Automated Execution and Tracking of the LHC Commissioning Tests

To ensure the correct operation and prevent system failures, which can lead to equipment damage in the worst case, all critical systems in the Large Hadron Collider (LHC), among them the superconducting circuits, have to be tested thoroughly during dedicated commissioning phases after each intervent...

Descripción completa

Detalles Bibliográficos
Autores principales: Fuchsberger, K, Baggiolini, V, Galetzka, M, Gorbonosov, R, Pojer, M, Solfaroli Camillocci, M, Zerlauth, M
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1470342
_version_ 1780925359084011520
author Fuchsberger, K
Baggiolini, V
Galetzka, M
Gorbonosov, R
Pojer, M
Solfaroli Camillocci, M
Zerlauth, M
author_facet Fuchsberger, K
Baggiolini, V
Galetzka, M
Gorbonosov, R
Pojer, M
Solfaroli Camillocci, M
Zerlauth, M
author_sort Fuchsberger, K
collection CERN
description To ensure the correct operation and prevent system failures, which can lead to equipment damage in the worst case, all critical systems in the Large Hadron Collider (LHC), among them the superconducting circuits, have to be tested thoroughly during dedicated commissioning phases after each intervention. In view of the around 7,000 individual tests to be performed each year after a Christmas stop, a lot of effort was already put into the automation of these tests at the beginning of LHC hardware commissioning in 2005, to assure the dependable execution and analysis of these tests. To further increase the productivity during the commissioning campaigns and to enforce a more consistent workflow, the development of a dedicated testing framework was launched. This new framework is designed to schedule and track the automated tests for all systems of the LHC and will also be extendable, e.g., to beam commissioning tests. This is achieved by re-using different, already existing execution frameworks. In this paper, we outline the motivation for this new framework and the related improvements in the commissioning process. Further, we sketch its design and present first experience from the recommissioning campaign in early 2012.
id cern-1470342
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14703422022-08-17T13:30:22Zhttp://cds.cern.ch/record/1470342engFuchsberger, KBaggiolini, VGaletzka, MGorbonosov, RPojer, MSolfaroli Camillocci, MZerlauth, MAutomated Execution and Tracking of the LHC Commissioning TestsAccelerators and Storage RingsTo ensure the correct operation and prevent system failures, which can lead to equipment damage in the worst case, all critical systems in the Large Hadron Collider (LHC), among them the superconducting circuits, have to be tested thoroughly during dedicated commissioning phases after each intervention. In view of the around 7,000 individual tests to be performed each year after a Christmas stop, a lot of effort was already put into the automation of these tests at the beginning of LHC hardware commissioning in 2005, to assure the dependable execution and analysis of these tests. To further increase the productivity during the commissioning campaigns and to enforce a more consistent workflow, the development of a dedicated testing framework was launched. This new framework is designed to schedule and track the automated tests for all systems of the LHC and will also be extendable, e.g., to beam commissioning tests. This is achieved by re-using different, already existing execution frameworks. In this paper, we outline the motivation for this new framework and the related improvements in the commissioning process. Further, we sketch its design and present first experience from the recommissioning campaign in early 2012.CERN-ATS-2012-205oai:cds.cern.ch:14703422012-08-01
spellingShingle Accelerators and Storage Rings
Fuchsberger, K
Baggiolini, V
Galetzka, M
Gorbonosov, R
Pojer, M
Solfaroli Camillocci, M
Zerlauth, M
Automated Execution and Tracking of the LHC Commissioning Tests
title Automated Execution and Tracking of the LHC Commissioning Tests
title_full Automated Execution and Tracking of the LHC Commissioning Tests
title_fullStr Automated Execution and Tracking of the LHC Commissioning Tests
title_full_unstemmed Automated Execution and Tracking of the LHC Commissioning Tests
title_short Automated Execution and Tracking of the LHC Commissioning Tests
title_sort automated execution and tracking of the lhc commissioning tests
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1470342
work_keys_str_mv AT fuchsbergerk automatedexecutionandtrackingofthelhccommissioningtests
AT baggioliniv automatedexecutionandtrackingofthelhccommissioningtests
AT galetzkam automatedexecutionandtrackingofthelhccommissioningtests
AT gorbonosovr automatedexecutionandtrackingofthelhccommissioningtests
AT pojerm automatedexecutionandtrackingofthelhccommissioningtests
AT solfarolicamilloccim automatedexecutionandtrackingofthelhccommissioningtests
AT zerlauthm automatedexecutionandtrackingofthelhccommissioningtests