Automated Execution and Tracking of the LHC Commissioning Tests
To ensure the correct operation and prevent system failures, which can lead to equipment damage in the worst case, all critical systems in the Large Hadron Collider (LHC), among them the superconducting circuits, have to be tested thoroughly during dedicated commissioning phases after each intervent...
Autores principales: | Fuchsberger, K, Baggiolini, V, Galetzka, M, Gorbonosov, R, Pojer, M, Solfaroli Camillocci, M, Zerlauth, M |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1470342 |
Ejemplares similares
-
Re-commissioning of the Superconducting Circuits
por: Solfaroli Camillocci, M, et al.
Publicado: (2015) -
Plug-in Based Analysis Framework for LHC Post-Mortem Analysis
por: Gorbonosov, R, et al.
Publicado: (2013) -
Commissioning of the LHC Magnet Powering System in 2009
por: Solfaroli Camillocci, Matteo, et al.
Publicado: (2010) -
Coordination of the commissioning of the LHC technical systems
por: Saban, R, et al.
Publicado: (2008) -
Operational experience during initial beam commissioning of the LHC
por: Fuchsberger, K, et al.
Publicado: (2010)